Tidigar share link specification

See sharing a roadmap as a link for the Share link dialog.

Public pre-release specification, versions 1 and 2. A readable link carries an editable roadmap as plain text records and opens without an account.

Hamacher Software AB publishes this specification under CC BY 4.0.

The keywords MUST, MUST NOT, SHOULD and MAY are normative. The roadmap model, its field rules and limits are defined in the Tidigar Roadmap Interoperability Specification.

https://open.tidigar.com/s#t=1~<record>~<record>~…~!

Links open in the web app or in an installed Tidigar app that claims the link. Until the opener is deployed, use https://app.tidigar.com/#t=1~… for the web app.

Records

RecordHolds
n=Namethe roadmap's name, required
d=Textits description
y=2026its year, required: the year of every MM-DD date
wplans in work days: Monday to Friday, without periods
u=thousandsdisplay costs in thousands
k=SEKthe plan currency for estimated costs, when present
r=KEYthe reference key prefix, up to 10 capital letters and digits
m1=Team:Design,Builda dimension and its options, in order
a1=title/start/days/…an activity
s1=title/date/…a milestone
p1=title/start/daysa period
v=timeline/…the view the roadmap opens in
c=3.1.1the number of activities, milestones and periods

Numbered records count from 1: a1, a2, … A link MUST NOT skip a number, and c= MUST give the counts, so a missing record or a cut link is noticed.

Activities

a3=Install_new_unit/11-02/5/Installer,Install/@a2,s2/50p/d=Ask_for_permits

Milestones and periods

s1=Heat_pump_in_operation/11-09/@a3
s2=Contract_signed/10-30/fixed
p1=Autumn_break/10-26/5

Dimensions and the view

Use progress for rows or columns and @progress or @follow-up-status for color. Links omit assignee settings.

Text

Tracking records

Use t=2 for a readable link with a baseline. Its other records follow the same grammar as version 1. Tracking fields are separated with / and write missing values as -.

Use full dates YYYY-MM-DD or local minutes YYYY-MM-DDTHH:mm for tracking values, minor units for budgets, and whole seconds in the UTC timestamp. Zero survives a copy. Compact copy links with tracking use s=2; other compact links use s=1. Full copies include historical baseline rows and give live records new IDs. The default copy omits tracking and uses s=1. To include tracking, turn off Leave out the baseline. A visible-only copy limits baseline rows to copied records. The readable Timeline setting baseline shows the baseline layer, and compact links keep it. Published screens carry only tracking approved at publication and used by the view. Both carry only the active baseline's dates and budgets. Links carry no actual or forecast values; a reader ignores older x records and the actuals Timeline setting.

Example

https://open.tidigar.com/s#t=1~n=Heat_pump_replacement~y=2026~w~m1=Team:Household,Installer~m2=Phase:Plan,Install~a1=Review_current_system/10-12/3/Household,Plan~a2=Request_quotes/10-15/6/Household,Plan/@a1~a3=Install_new_unit/11-02/5/Installer,Install/@a2,s2~s1=Heat_pump_in_operation/11-09/@a3~s2=Contract_signed/10-30/fixed~p1=Autumn_break/10-26/5~v=timeline/color:Team/group:Phase~c=3.2.1~!

Installation waits for quotes and the signed contract. The work-day timeline groups by Phase and colors by Team.

Tidigar copies the roadmap into the recipient's library with new record IDs. Reopening the same link on a device selects that copy.

Activities and milestones get reference keys in link order (WL-1, WL-2), using r= or a prefix derived from the plan name. The first saved view is Classic, framed by the earliest and latest activity or milestone dates with three days of margin on each side. Later periods remain visible. The plan opens in v= when present and Classic by default.

Tidigar reports repairs by record, such as clearing an unknown option or moving an activity after its dependency. For irremediable input such as a1: start "02-30" is not a date, Tidigar refuses the link and lists every problem. Repairs preserve all activities, milestones and periods.

Open Tidigar's compressed links (#s=1.… or #s=2.…) in the app.

Optional validation

To check a finished link locally:

node tidigar-link.mjs --validate "<finished URL>"

The module reports dates, dependencies, counts, fragment length and corrections. It leaves the link unchanged. Exit 0 means it opens without corrections. Exit 1 means invalid input, corrections or a fragment over 1,900 characters.

The agent guide links to the Plan JSON v1 schema and local builders. The builders validate the plan and print the link, dated summary and fragment length, or name the invalid rule and record. --read <link> prints Plan JSON from a t=1 link. The module exports createLink(plan), readLink(link) and embedCode(link, title).

See llms.txt for direct authoring and worked examples.