Tidigar Calendar Storage Specification
See the calendar example for a visual preview of roadmap activities and milestones as calendar events.
Status: public pre-release specification. It defines how another application can read and edit a Tidigar roadmap stored as events in a calendar. The records, fields and validation rules are those of the Tidigar Roadmap Interoperability Specification; this document only defines how a calendar holds them.
License: published by Hamacher Software AB under CC BY 4.0. Anyone may implement the formats it describes, in any software, without asking.
The keywords MUST, MUST NOT, SHOULD, SHOULD NOT and MAY are normative. The current calendar URL and Notes envelope versions are listed in the model specification's version table.
Events
A calendar-backed roadmap consists of exactly one manifest event plus one event for every item, shared view and dimension. An item is an activity, a milestone or a period, and each is an item event. The calendar MAY contain unrelated events; a conforming implementation MUST leave them untouched. Every owned event is non-recurring and carries a validated identity URL.
| Record | Event title | Notes | Date shape |
|---|---|---|---|
| manifest | Tidigar Project Metadata – <project name> | Manifest Notes envelope | All-day 2000-01-01 through exclusive 2000-01-02 |
| activity | Item title | Item description as Markdown source | All-day start through the day after inclusive end, or the undated day below |
| milestone | Item title | Item description as ordinary text | All-day start through the next day, or the undated day below |
| period | Item title | Item description as ordinary text | All-day start through the day after inclusive end |
| view | Tidigar View – <view name> | View Notes envelope | All-day 2000-01-01 through exclusive 2000-01-02 |
| dimension | Tidigar Dimension – <dimension name> | Dimension Notes envelope | All-day 2000-01-01 through exclusive 2000-01-02 |
Copy activity Markdown verbatim between description and event Notes, including existing plain text and its line breaks. The URL carries no description.
Calendar record type comes only from the validated URL: its path, and for an item the record tag in m, which is the item's type. Dated activities, dated milestones and periods MUST be all-day; manifest, view and dimension records MUST use the fixed metadata day. No Tidigar record may recur. Calendar dates MUST be calculated as calendar days rather than 86,400-second durations. Activities and milestones at local times are timed instead.
An undated activity or milestone uses an all-day event on 2000-01-02, through exclusive 2000-01-03, with the undated metadata header defined below. A dated activity or milestone on the same day has the ordinary header. If someone moves or resizes a marked event, or makes it timed, its new shape supplies its dates or local times. A marked event reads as undated only while it covers exactly the undated day. Deleting the event removes the item.
Each record is a separate event so that people who edit the same calendar from several devices, also offline, touch only the records they change. Adding, removing or reordering records keeps the manifest event, except when the first undated activity upgrades its URL. A calendar provider settles two edits of the same event by keeping one of them.
Calendar URL
Every Tidigar event stores its identity in EKEvent.url:
https://open.tidigar.com/<path>?v=<version>&p=<projectId22>[&i=<recordId22>&m=<metadata>]
The origin has no user, port or fragment. Query order does not matter. The validated path and, for an item, the record tag in m are the only record-type discriminators. Duplicate known keys, an unknown v, a missing required key, a non-canonical UUID or metadata on the manifest are errors. Unknown keys are ignored and never taken as a newer version.
The address opens the record in the Tidigar apps. Opened in a web browser, it shows a page asking the reader to install the app.
| Key | manifest | item | view | dimension | Value |
|---|---|---|---|---|---|
| path | /project | /item | /view | /dimension | Record type; the manifest uses /project |
v | yes | yes | yes | yes | Calendar representation version: 7 |
p | yes | yes | yes | yes | manifest.projectId as a 22-character compact UUID |
i | — | yes | yes | yes | Record ID as a 22-character compact UUID |
m | — | yes | yes | yes | Compact metadata, below |
The record URLs use version 7. Earlier versions which stored milestones and periods under paths of their own are unsupported.
p and i encode the UUID's 16 bytes directly as unpadded base64url. They do not shorten, hash or otherwise replace the canonical UUID; all 128 bits survive.
m is an unpadded base64url representation of deterministic, type-specific binary data. Canonical project JSON and exported JSON retain the descriptive field names in the tables above. The binary transport starts with this header:
| Byte | Meaning |
|---|---|
0 | Compact metadata version: 0x02 for ordinary records and 0x04 for undated work |
1 | Record tag: activity 0x01, milestone 0x02, period 0x03, view 0x04, dimension 0x05 |
2 | rankLength:varuint, 1 through 32 |
3… | rankLength rank bytes; the last one is not 0 |
Integers named count or length use canonical unsigned LEB128: the shortest encoding is required. uuid is the UUID's 16 bytes in the same order as its 32 hexadecimal digits. A decoder rejects truncation, trailing data, a wrong record tag, an invalid rank, non-minimal counts, duplicate item dimension IDs and non-canonical base64url. An /item URL carries an activity, milestone or period tag; a view or dimension URL carries its own.
| Record | Bytes after the rank |
|---|---|
| activity | progressIndex:u8, the values, dependencyCount:varuint, repetitions of dependencyUuid:uuid, then, only when startAfter is not empty, one startAfterIndex:u8 per dependency in the same order, then the optional estimated cost and reference key |
| milestone | progressIndex:u8, 0 or 4, the values, dependencyCount:varuint, repetitions of dependencyUuid:uuid, then 1 as one more byte only when fixed is true, then the reference key |
| period | The values, then the reference key |
| view | Nothing |
| dimension | Nothing |
The values are valueCount:varuint and sorted repetitions of dimensionUuid:uuid + optionUuid:uuid. progressIndex is 0 through 4, representing 0, 25, 50, 75 and 100; a milestone's is 0 while open and 4 when done. startAfterIndex uses the same scale; 4 marks a dependency without a share, and at least one is below 4. The reference key ref is written only when the record has one: the byte 0x52, refLength:varuint from 1 through 128, and the key's UTF-8 bytes. A byte 0x52 where a startAfterIndex or the fixed byte could start is the reference key. Item values sort by dimension UUID bytes; dependency array order remains canonical project order. The 0x04 header marks an activity or milestone as undated and forbids overlap shares. Its other fields use the same layout. A period is never undated. When present, an activity’s estimated cost is tag 0x54 followed by the shortest unsigned base-128 encoding of the integer in minor units. Zero uses a single value byte. The maximum is 99999999999. The manifest carries costCurrency in its Notes payload, with costUnit if set. Readers that predate this tag cannot open those items.
An undated activity with rank 0x80, zero progress and empty values and dependencies has m=BAEBgAAAAA. Title, dates and description are never duplicated in m. Examples, all with the rank 0x80:
| Type | m | Descriptive fields represented |
|---|---|---|
| activity | AgEBgAIBAAAAAAAAQACAAAAAAAAAAgAAAAAAAEAAgAAAAAAAAAMA | progress: 50, one values entry, empty dependsOn |
| milestone | AgIBgAAAAQAAAAAAAEAAgAAAAAAAAAY | open, one dependsOn UUID, not fixed |
| milestone | AgIBgAQAAAE | done, empty dependsOn, fixed: true |
| milestone | AgIBgAAAAAFSA00tMQ | empty dependsOn, fixed: true, ref: "M-1" |
| period | AgMBgAA | empty values |
| period | AgMBgAEAAAAAAABAAIAAAAAAAAACAAAAAAAAQACAAAAAAAAAAw | one values entry |
| view | AgQBgA | the rank only |
| dimension | AgUBgA | the rank only |
Record order
The rank orders the records of one kind. Readers sort items, of every type together, views and dimensions each by their rank bytes, where a shorter rank that is a prefix of a longer one comes first, and then by record ID. Ranks need not be unique or evenly spaced.
A rank is a fraction in base 256: byte b at position n is worth b / 256^(n+1). Because no rank ends with a 0 byte, there is always a rank strictly between two different ones. A writer SHOULD keep the rank of every record whose relative order did not change and give a moved or new record a rank between its neighbours, so that a reorder rewrites only the records that moved. When a rank would exceed 32 bytes, the writer gives every record of that kind a new rank.
| Value | Maximum UTF-8/decoded bytes |
|---|---|
| Complete event URL | 4096 |
Decoded m metadata | 3072 |
| Rank | 32 |
| Complete metadata Notes | 16384 |
Exceeding a limit fails the save rather than truncating.
Notes envelopes
The manifest, view and dimension events carry their data in Notes, inside a versioned envelope (format: "tidigar-calendar-notes", version: 2) between delimiter lines. The complete UTF-8 Notes value has this form, with one line feed (LF) at each shown line break and no final line feed:
Tidigar calendar metadata.
--- TIDIGAR-METADATA-V2 ---
{"format":"tidigar-calendar-notes","version":2,"section":"<section>","payload":{...}}
--- END TIDIGAR-METADATA-V2 ---
JSON object key order is insignificant. Writers SHOULD use compact JSON to leave maximum provider headroom. Complete Notes are limited to 16,384 bytes.
| Section | Payload keys |
|---|---|
manifest | manifest |
view | view |
dimension | dimension |
The manifest payload is the manifest without dimensions; each dimension, with its options, is the payload of its own dimension event.
Calendar manifests use Notes version 2 and MUST NOT contain a baseline key. Calendar copies carry dates, progress and estimates. Baseline and tracking settings belong to the source plan.
Reading a calendar roadmap
- Find the single manifest event by the fixed metadata day and validate its URL, Notes envelope and manifest payload. A name match is not ownership.
- Scan the complete supported model date domain, 1900 through 2200, for events in that same calendar. Select only events whose validated URL has the same project UUID and a supported path/version.
- Duplicate record IDs or a second manifest are errors. A record that has no event is not part of the project.
- Map event fields, Notes and packed metadata into descriptive canonical records, order each record kind by rank, set the manifest's
dimensionsfrom the dimension events and validate the whole project.
Scanning only a visible date range is not a complete read. Calendar provider event identifiers are provider-local and MUST NOT enter the canonical project or be used as stable Tidigar identity.
Creating or editing a calendar roadmap
Creation is safe only in a newly created, verified calendar. Editing an existing calendar is safe only after a complete valid Tidigar project has been read from it. A writer MUST:
- Validate the complete updated canonical project.
- Build the full desired event set using the mapping above, URLs of the plan's kind with ranks, and Notes envelopes. Preserve unknown URL query items only when they do not duplicate
v,p,iorm. - Compare with a fresh provider snapshot to detect concurrent changes.
- Create/update/delete only events owned by that validated project. Never delete the calendar or unrelated events.
- Read back provider results before acknowledging the save. Truncation or an incomplete record set is an error, never a partial success.
The compact m examples above are sufficient to verify byte ordering and encoding independently.
Local times
An activity or milestone whose model value is a local time, not a date, is a timed event with the same URL, metadata and Notes as any other record; whether its event is all-day or timed is its precision. One calendar holds records of both kinds.
| Record | Date shape |
|---|---|
| activity | Timed from start to one minute after the inclusive end, in the plan's timeZone |
| milestone | Timed fifteen minutes from start, in the plan's timeZone; that end never delays work |
| period | Always all-day |
A plan with local times MUST have a timeZone to be written to a calendar.
Writing resolves a local time in the plan's timeZone: a time skipped by a change to summer time moves forward to the first valid minute, and a time that occurs twice uses the earlier offset. Reading converts an event's start, and an activity's end less one minute, back to local minutes in that zone. A timed milestone reads its start whatever its length, and a dated one its first day. An activity or milestone that another application makes all-day or timed is read in its new precision. In a plan without a timeZone, a timed activity or milestone is an unsupported event shape.