Compare · Microsoft Project
Tidigar vs Microsoft Project
Microsoft Project is the classic desktop scheduler for complex programmes. Tidigar gives you the core scheduling tools most teams actually use — timeline, dependencies, critical line, baselines and planned costs — in a fast browser and mobile app that anyone can open from a link.
Side-by-side comparison
| Area | Tidigar | Microsoft Project |
|---|---|---|
| Platforms | Any modern browser on Mac, Windows, Linux, iOS and Android; installable offline | Desktop app is Windows-only; web plans require a Microsoft 365 subscription |
| Opening a shared plan | One link opens an interactive copy — no account or license needed | Recipients need a Project license or a static PDF/image export |
| Dependencies and critical line | Finish-to-start links, automatic date shifting and critical line in timeline and flow | Full dependency types (FS, SS, FF, SF), lag/lead and critical path analysis |
| Baselines and planned costs | Save a baseline, compare schedule slip and track planned cost vs budget | Multiple baselines, resource rates and earned value management |
| Views | Timeline, board, list and flowchart on the same plan | Gantt, task usage, resource sheet and calendar views |
| Team collaboration | Free for up to 5 people; Business includes 5 free reader seats per editor | Per-user paid licensing tied to Microsoft 365 |
| Self-hosting and data control | Local-only in browser, EU-hosted cloud, or Tidigar Server | Local .mpp files, Microsoft cloud or Project Server |
Where Tidigar is a better fit
- Zero friction for stakeholders: Send a link or embed the plan on an intranet or office screen instead of exporting blurry PDFs every Friday.
- Fast on every device: Every edit happens locally first on Mac, Windows, iPhone and Android — even offline on a train or flight.
- Planning and follow-up in one place: Turn activities into tickets with assignees, comments, @mentions and AI agents over MCP.
- Smooth migration: Export XML from Microsoft Project and open it directly with the MS Project converter.
When Microsoft Project is a better fit
If you manage large engineering or construction programmes that require automatic resource levelling across hundreds of people, earned value management (EVM), or deep integration with existing Microsoft Project Server governance, Microsoft Project desktop is built specifically for that level of specialisation.
Try the MS Project XML converter · All comparisons · Pricing