# Tidigar > Tidigar is a visual roadmap and Gantt chart editor. Create an editable plan > as a link, or work on a plan stored in Tidigar or Tidigar Server. ## Choose the right action - **Create a plan or share a copy:** write a link directly as described below. The whole plan travels in the link. No account or upload is needed. Anyone with the link can read it; later edits do not update other copies. - **Save, find, open or change a stored plan:** follow [Plans stored in Tidigar](https://tidigar.com/agents/stored-plans.md). This includes a `/p/` link or a request to edit the original in Tidigar. Public chat assistants use remote MCP with delegated OAuth consent at `https://app.tidigar.com/mcp`; the linked guide covers connecting when tools are missing. Return the stored plan's `url`, not a separate copy. - **Work a ticket in a stored plan:** find it with `tidigar_list_activities`, read it with `tidigar_get_activity`, then use `tidigar_claim_activity`. Report progress with `tidigar_update_activity` and leave the result, checks and commit link in `tidigar_add_comment`. Set progress to 100 when done and dependencies permit it. [Ticket workflow](https://tidigar.com/agents/stored-plans.md#activities-as-tickets). ## Write activity descriptions Store Markdown source in `description`. Use the [supported syntax](https://tidigar.com/agents/docs/file-format.md#item-activity) and preserve existing source, including single line breaks and unsupported syntax, unless you are editing the description. ## Create a share link Write the link directly in the user's language. Choose dates and durations, state assumptions, and check dependencies and record counts. Unless asked otherwise, use useful dimensions such as Team and Phase or Status. Return a clickable link. A script is optional for validation. ## Example A calendar-day plan: Design takes ten days from March 2. Build starts after Design, takes twenty days, and is 50% complete. Launch is the day after Build. Team groups and colors the timeline; Phase supplies the board columns. ```text https://open.tidigar.com/s#t=1~n=Website_launch~y=2026~m1=Team:Design,Development~m2=Phase:Plan,Build~a1=Design/03-02/10/Design,Plan~a2=Build/03-16/20/Development,Build/@a1/50p~s1=Launch/04-05/@a2~v=timeline/group:Team/color:Team~c=2.1.0~! ``` ## Link syntax - Start with `t=1`, separate records with `~` and end with `~!`. `_` is a space. - `n=` is the name and `y=` the year; both are required. `w` plans in work days (Monday–Friday, excluding periods); `d=` describes the roadmap. - `m1=Team:Design,Development` is a dimension and its options in order. Number records from 1 without gaps: `m1`, `m2`, `a1`, `a2`, `s1`, `p1`. - `a1=title/start/days` is an activity. The start is `MM-DD` in year `y`, or `YYYY-MM-DD` for another year, including plans spanning several years. Short dates always use `y`. Days counts its days, `1` for a single day; in work days with `w`. Then, in any order: its options by name (`Design,Plan`), `@a1,s2` for what it waits for, `@a1:50` for a partial dependency, `0p`, `25p`, `50p`, `75p` or `100p` for progress and `d=` for a description. Encode its Markdown using the text escapes below. List options in dimension order: repeated names such as `Network,Network` select the first and second dimensions respectively. Use `Team:Design` to select a dimension explicitly, or `Size:50p` when an option looks like progress. - An activity normally starts at least one day after each predecessor ends. `@a1:50` instead allows a start after half its planned days, rounded up; thresholds are `0`, `25`, `50`, `75` or `100`, with `100` the default. This uses planned duration, not reported progress. With several dependencies, all thresholds must be met. A record may start on a milestone's date. Dependencies must not form a cycle. - `s1=title/date/@a1,p1` is a milestone after what it waits for; `fixed` marks an event on a set date, which it keeps. - `p1=title/start/days` is a period of time off, such as a vacation; a plan in work days has no work days during it. - `v=` opens the roadmap: `timeline`, `board`, `list`, `flow`, `classic` (one row per activity under a label column, as in MS Project) or `compact`, then `group:Team`, `color:Team`, `rows:Team` or `columns:Phase`. - With no `v=`, the link opens in Classic, summarized by the first dimension. Classic is the first saved view and frames the plan's dates with three days of margin on each side. An explicit `v=` keeps the requested view. A view can also set a date range with `/start:03-01/end:06-30`. - `c=2.1.0` counts the activities, milestones and periods. - `_` is a space. In text, escape `/` as `%2F`, `~` as `%7E`, `_` as `%5F`, `%` as `%25`, `&` as `%26`, `#` as `%23`, `(` as `%28`, `)` as `%29`, `"` as `%22`, `<` as `%3C` and `>` as `%3E`. In dimension or option names, also escape `,` as `%2C`, `:` as `%3A`, `@` as `%40` and `=` as `%3D`. In Markdown descriptions, also escape backticks as `%60`, square brackets as `%5B` and `%5D`, braces as `%7B` and `%7D`, vertical bar as `%7C`, backslash as `%5C` and `^` as `%5E`. Use `%0A` for a line feed, `%0D` for a carriage return and `%09` for a tab. Write å, ä, ö and other letters as they are. - Titles are at most 180 characters, dimension and roadmap names 100, and the roadmap description 500. Years are 1900–2200. - Keep the fragment after `#` within 1,900 characters. If necessary, shorten titles or descriptions, or propose a smaller plan and explain omissions. Never truncate a link or silently drop activities. ## Change a share link Edit the relevant `#t=1~…~!` records. Keep other records and references, update `c=` after additions or removals and recheck dependent dates. The original URL keeps opening the original plan. Open compressed `#s=1.…` links in Tidigar. ## Return or embed the finished link Keep the clickable URL on one line with its escapes intact. To embed, use the same fragment on `https://embed.tidigar.com/`: ```html ``` ## Optional validation To check a finished link with a script, download [tidigar-link.mjs](https://tidigar.com/agents/v1/tidigar-link.mjs) and run it locally with Node.js 20 or later: ```sh node tidigar-link.mjs --validate "" ``` Exit 0 means the link opens without corrections. Exit 1 reports invalid input or corrections to review. The script runs locally. ## Reference, only when needed - [Share link specification](https://tidigar.com/agents/docs/share-links.md): complete syntax and opening behavior, for edge cases. - [Plan JSON and builders](https://tidigar.com/agents/plan-json.md): optional JSON input, JavaScript and Python builders and module usage. - [Plans stored in Tidigar](https://tidigar.com/agents/stored-plans.md): remote MCP, delegated OAuth connection and safe updates for chat assistants. - [Examples](https://tidigar.com/agents/example_sharelink.md): a larger plan, its optional JSON representation and a link change. - [llms-full.txt](https://tidigar.com/llms-full.txt): single-file bundle; skip if you already read this guide or installed the skill. - [Example roadmaps](https://tidigar.com/examples/): plans to start from. - [Roadmaps in Markdown](https://tidigar.com/agents/docs/markdown.md), [embed stories](https://tidigar.com/agents/docs/stories.md) and [roadmap file format](https://tidigar.com/agents/docs/file-format.md): use when the user asks for those formats; they are not needed to create a link.