# Tidigar > Tidigar is a visual roadmap and Gantt chart editor. Create an editable plan > as a link, or work on a plan stored in Tidigar or Tidigar Server. ## Choose the right action - **Create a plan or share a copy:** write a link directly as described below. The whole plan travels in the link. No account or upload is needed. Anyone with the link can read it; later edits do not update other copies. - **Save, find, open or change a stored plan:** follow [Plans stored in Tidigar](https://tidigar.com/agents/stored-plans.md). This includes a `/p/` link or a request to edit the original in Tidigar. Public chat assistants use remote MCP with delegated OAuth consent at `https://app.tidigar.com/mcp`; the linked guide covers connecting when tools are missing. Return the stored plan's `url`, not a separate copy. - **Work a ticket in a stored plan:** find it with `tidigar_list_activities`, read it with `tidigar_get_activity`, then use `tidigar_claim_activity`. Report progress with `tidigar_update_activity` and leave the result, checks and commit link in `tidigar_add_comment`. Set progress to 100 when done and dependencies permit it. [Ticket workflow](https://tidigar.com/agents/stored-plans.md#activities-as-tickets). ## Write activity descriptions Store Markdown source in `description`. Use the [supported syntax](https://tidigar.com/agents/docs/file-format.md#item-activity) and preserve existing source, including single line breaks and unsupported syntax, unless you are editing the description. ## Create a share link Write the link directly in the user's language. Choose dates and durations, state assumptions, and check dependencies and record counts. Unless asked otherwise, use useful dimensions such as Team and Phase or Status. Return a clickable link. A script is optional for validation. ## Example A calendar-day plan: Design takes ten days from March 2. Build starts after Design, takes twenty days, and is 50% complete. Launch is the day after Build. Team groups and colors the timeline; Phase supplies the board columns. ```text https://open.tidigar.com/s#t=1~n=Website_launch~y=2026~m1=Team:Design,Development~m2=Phase:Plan,Build~a1=Design/03-02/10/Design,Plan~a2=Build/03-16/20/Development,Build/@a1/50p~s1=Launch/04-05/@a2~v=timeline/group:Team/color:Team~c=2.1.0~! ``` ## Link syntax - Start with `t=1`, separate records with `~` and end with `~!`. `_` is a space. - `n=` is the name and `y=` the year; both are required. `w` plans in work days (Monday–Friday, excluding periods); `d=` describes the roadmap. - `m1=Team:Design,Development` is a dimension and its options in order. Number records from 1 without gaps: `m1`, `m2`, `a1`, `a2`, `s1`, `p1`. - `a1=title/start/days` is an activity. The start is `MM-DD` in year `y`, or `YYYY-MM-DD` for another year, including plans spanning several years. Short dates always use `y`. Days counts its days, `1` for a single day; in work days with `w`. Then, in any order: its options by name (`Design,Plan`), `@a1,s2` for what it waits for, `@a1:50` for a partial dependency, `0p`, `25p`, `50p`, `75p` or `100p` for progress and `d=` for a description. Encode its Markdown using the text escapes below. List options in dimension order: repeated names such as `Network,Network` select the first and second dimensions respectively. Use `Team:Design` to select a dimension explicitly, or `Size:50p` when an option looks like progress. - An activity normally starts at least one day after each predecessor ends. `@a1:50` instead allows a start after half its planned days, rounded up; thresholds are `0`, `25`, `50`, `75` or `100`, with `100` the default. This uses planned duration, not reported progress. With several dependencies, all thresholds must be met. A record may start on a milestone's date. Dependencies must not form a cycle. - `s1=title/date/@a1,p1` is a milestone after what it waits for; `fixed` marks an event on a set date, which it keeps. - `p1=title/start/days` is a period of time off, such as a vacation; a plan in work days has no work days during it. - `v=` opens the roadmap: `timeline`, `board`, `list`, `flow`, `classic` (one row per activity under a label column, as in MS Project) or `compact`, then `group:Team`, `color:Team`, `rows:Team` or `columns:Phase`. - With no `v=`, the link opens in Classic, summarized by the first dimension. Classic is the first saved view and frames the plan's dates with three days of margin on each side. An explicit `v=` keeps the requested view. A view can also set a date range with `/start:03-01/end:06-30`. - `c=2.1.0` counts the activities, milestones and periods. - `_` is a space. In text, escape `/` as `%2F`, `~` as `%7E`, `_` as `%5F`, `%` as `%25`, `&` as `%26`, `#` as `%23`, `(` as `%28`, `)` as `%29`, `"` as `%22`, `<` as `%3C` and `>` as `%3E`. In dimension or option names, also escape `,` as `%2C`, `:` as `%3A`, `@` as `%40` and `=` as `%3D`. In Markdown descriptions, also escape backticks as `%60`, square brackets as `%5B` and `%5D`, braces as `%7B` and `%7D`, vertical bar as `%7C`, backslash as `%5C` and `^` as `%5E`. Use `%0A` for a line feed, `%0D` for a carriage return and `%09` for a tab. Write å, ä, ö and other letters as they are. - Titles are at most 180 characters, dimension and roadmap names 100, and the roadmap description 500. Years are 1900–2200. - Keep the fragment after `#` within 1,900 characters. If necessary, shorten titles or descriptions, or propose a smaller plan and explain omissions. Never truncate a link or silently drop activities. ## Change a share link Edit the relevant `#t=1~…~!` records. Keep other records and references, update `c=` after additions or removals and recheck dependent dates. The original URL keeps opening the original plan. Open compressed `#s=1.…` links in Tidigar. ## Return or embed the finished link Keep the clickable URL on one line with its escapes intact. To embed, use the same fragment on `https://embed.tidigar.com/`: ```html ``` ## Optional validation To check a finished link with a script, download [tidigar-link.mjs](https://tidigar.com/agents/v1/tidigar-link.mjs) and run it locally with Node.js 20 or later: ```sh node tidigar-link.mjs --validate "" ``` Exit 0 means the link opens without corrections. Exit 1 reports invalid input or corrections to review. The script runs locally. ## Reference, only when needed - [Share link specification](https://tidigar.com/agents/docs/share-links.md): complete syntax and opening behavior, for edge cases. - [Plan JSON and builders](https://tidigar.com/agents/plan-json.md): optional JSON input, JavaScript and Python builders and module usage. - [Plans stored in Tidigar](https://tidigar.com/agents/stored-plans.md): remote MCP, delegated OAuth connection and safe updates for chat assistants. - [Examples](https://tidigar.com/agents/example_sharelink.md): a larger plan, its optional JSON representation and a link change. - [llms-full.txt](https://tidigar.com/llms-full.txt): single-file bundle; skip if you already read this guide or installed the skill. - [Example roadmaps](https://tidigar.com/examples/): plans to start from. - [Roadmaps in Markdown](https://tidigar.com/agents/docs/markdown.md), [embed stories](https://tidigar.com/agents/docs/stories.md) and [roadmap file format](https://tidigar.com/agents/docs/file-format.md): use when the user asks for those formats; they are not needed to create a link. --- # Tidigar examples for AI agents Follow [llms.txt](https://tidigar.com/llms.txt) to write a link directly. No tool calls or scripts are needed. ## Create a plan directly The user asks for a roadmap for launching their new app, with design, engineering and marketing work in phases. No date is given, so the agent starts on a coming Monday, here 11 January 2027, and chooses fifteen activities with dependencies, a Team dimension and a Phase dimension. Choose dates, write the dimensions and activities as text records, then add the milestone, view, counts and final `~!`. The finished link is: https://open.tidigar.com/s#t=1~n=Launch_the_new_app~d=From_goals_to_launch_day_and_the_first_weeks_after.~y=2027~m1=Team:Design,Engineering,Marketing~m2=Phase:Plan,Build,Launch~a1=Set_the_launch_goals/01-11/3/Marketing,Plan/100p~a2=Interview_users/01-14/9/Design,Plan/@a1~a3=Plan_the_architecture/01-14/7/Engineering,Plan/@a1~a4=Plan_the_campaign/01-14/14/Marketing,Plan/@a1~a5=Design_the_app/01-25/12/Design,Build/@a2~a6=Build_the_backend/01-21/23/Engineering,Build/@a3~a7=Build_the_app/02-15/19/Engineering,Build/@a5,a6~a8=Create_app_store_assets/02-08/12/Design,Build/@a5~a9=Build_the_launch_page/02-22/10/Marketing,Build/@a4,a8~a10=Beta_test/03-08/12/Engineering,Launch/@a7~a11=Fix_beta_feedback/03-22/5/Engineering,Launch/@a10~a12=App_store_review/03-29/5/Engineering,Launch/@a11~a13=Brief_press_and_partners/03-29/5/Marketing,Launch/@a9,a11~a14=Run_the_launch_campaign/04-06/11/Marketing,Launch/@a12,a13~a15=Review_user_feedback/04-26/5/Design,Launch/@a14~s1=Launch_day/04-05/@a12,a13~v=timeline/color:Team/group:Phase/start:01-11/end:04-30~c=15.1.0~! Return it as a clickable Markdown link, explaining the assumed start date and durations. Opening it in Tidigar checks the records. Optionally run `node tidigar-link.mjs --validate ""` beforehand. ## Change a link directly The user says: "The beta test can only start a week later." Read the link's activity records and dependencies directly. Move Beta test (`a10`) and everything that waits on it, directly or indirectly, seven days later: `a11`, `a12`, `a13`, `a14`, `a15` and milestone `s1`. Keep their durations and references. Update the view's end from `04-30` to `05-07`; counts remain `c=15.1.0`. Return the edited URL as a new clickable link. The first link keeps opening the first plan. ## Optional JSON builder example The same plan can optionally be written as JSON and built with a script. This is a reference for code-based workflows, not a prerequisite for making a link. ### Launch an app The request: ```text Make a Tidigar roadmap for launching our new app: design, engineering and marketing work in phases, with dependencies and a launch day. ``` The agent starts on a coming Monday, assumes durations a typical launch takes, names the dimensions Team and Phase, refers to dependencies by title and opens the link as a timeline grouped by phase and colored by team. It writes `plan.json`: ```json { "$schema": "https://tidigar.com/agents/schema/plan-v1.json", "version": 1, "name": "Launch the new app", "description": "From goals to launch day and the first weeks after.", "dimensions": { "Team": ["Design", "Engineering", "Marketing"], "Phase": ["Plan", "Build", "Launch"] }, "activities": [ { "title": "Set the launch goals", "start": "2027-01-11", "end": "2027-01-13", "progress": 100, "values": { "Team": "Marketing", "Phase": "Plan" } }, { "title": "Interview users", "start": "2027-01-14", "end": "2027-01-22", "values": { "Team": "Design", "Phase": "Plan" }, "dependsOn": ["Set the launch goals"] }, { "title": "Plan the architecture", "start": "2027-01-14", "end": "2027-01-20", "values": { "Team": "Engineering", "Phase": "Plan" }, "dependsOn": ["Set the launch goals"] }, { "title": "Plan the campaign", "start": "2027-01-14", "end": "2027-01-27", "values": { "Team": "Marketing", "Phase": "Plan" }, "dependsOn": ["Set the launch goals"] }, { "title": "Design the app", "start": "2027-01-25", "end": "2027-02-05", "values": { "Team": "Design", "Phase": "Build" }, "dependsOn": ["Interview users"] }, { "title": "Build the backend", "start": "2027-01-21", "end": "2027-02-12", "values": { "Team": "Engineering", "Phase": "Build" }, "dependsOn": ["Plan the architecture"] }, { "title": "Build the app", "start": "2027-02-15", "end": "2027-03-05", "values": { "Team": "Engineering", "Phase": "Build" }, "dependsOn": ["Design the app", "Build the backend"] }, { "title": "Create app store assets", "start": "2027-02-08", "end": "2027-02-19", "values": { "Team": "Design", "Phase": "Build" }, "dependsOn": ["Design the app"] }, { "title": "Build the launch page", "start": "2027-02-22", "end": "2027-03-03", "values": { "Team": "Marketing", "Phase": "Build" }, "dependsOn": ["Plan the campaign", "Create app store assets"] }, { "title": "Beta test", "start": "2027-03-08", "end": "2027-03-19", "values": { "Team": "Engineering", "Phase": "Launch" }, "dependsOn": ["Build the app"] }, { "title": "Fix beta feedback", "start": "2027-03-22", "end": "2027-03-26", "values": { "Team": "Engineering", "Phase": "Launch" }, "dependsOn": ["Beta test"] }, { "title": "App store review", "start": "2027-03-29", "end": "2027-04-02", "values": { "Team": "Engineering", "Phase": "Launch" }, "dependsOn": ["Fix beta feedback"] }, { "title": "Brief press and partners", "start": "2027-03-29", "end": "2027-04-02", "values": { "Team": "Marketing", "Phase": "Launch" }, "dependsOn": ["Build the launch page", "Fix beta feedback"] }, { "title": "Run the launch campaign", "start": "2027-04-06", "end": "2027-04-16", "values": { "Team": "Marketing", "Phase": "Launch" }, "dependsOn": ["App store review", "Brief press and partners"] }, { "title": "Review user feedback", "start": "2027-04-26", "end": "2027-04-30", "values": { "Team": "Design", "Phase": "Launch" }, "dependsOn": ["Run the launch campaign"] } ], "milestones": [{ "title": "Launch day", "start": "2027-04-05", "dependsOn": ["App store review", "Brief press and partners"] }], "view": { "type": "timeline", "groupBy": "Phase", "colorBy": "Team" } } ``` `node tidigar-link.mjs plan.json` prints the link, a summary to check against the request and the link's size: ```text https://open.tidigar.com/s#t=1~n=Launch_the_new_app~d=From_goals_to_launch_day_and_the_first_weeks_after.~y=2027~m1=Team:Design,Engineering,Marketing~m2=Phase:Plan,Build,Launch~a1=Set_the_launch_goals/01-11/3/Marketing,Plan/100p~a2=Interview_users/01-14/9/Design,Plan/@a1~a3=Plan_the_architecture/01-14/7/Engineering,Plan/@a1~a4=Plan_the_campaign/01-14/14/Marketing,Plan/@a1~a5=Design_the_app/01-25/12/Design,Build/@a2~a6=Build_the_backend/01-21/23/Engineering,Build/@a3~a7=Build_the_app/02-15/19/Engineering,Build/@a5,a6~a8=Create_app_store_assets/02-08/12/Design,Build/@a5~a9=Build_the_launch_page/02-22/10/Marketing,Build/@a4,a8~a10=Beta_test/03-08/12/Engineering,Launch/@a7~a11=Fix_beta_feedback/03-22/5/Engineering,Launch/@a10~a12=App_store_review/03-29/5/Engineering,Launch/@a11~a13=Brief_press_and_partners/03-29/5/Marketing,Launch/@a9,a11~a14=Run_the_launch_campaign/04-06/11/Marketing,Launch/@a12,a13~a15=Review_user_feedback/04-26/5/Design,Launch/@a14~s1=Launch_day/04-05/@a12,a13~v=timeline/color:Team/group:Phase/start:01-11/end:04-30~c=15.1.0~! Launch the new app (2027) activities[0] Set the launch goals: 2027-01-11 – 2027-01-13 · 100% done · Team: Marketing · Phase: Plan activities[1] Interview users: 2027-01-14 – 2027-01-22 · Team: Design · Phase: Plan · after activities[0] activities[2] Plan the architecture: 2027-01-14 – 2027-01-20 · Team: Engineering · Phase: Plan · after activities[0] activities[3] Plan the campaign: 2027-01-14 – 2027-01-27 · Team: Marketing · Phase: Plan · after activities[0] activities[4] Design the app: 2027-01-25 – 2027-02-05 · Team: Design · Phase: Build · after activities[1] activities[5] Build the backend: 2027-01-21 – 2027-02-12 · Team: Engineering · Phase: Build · after activities[2] activities[6] Build the app: 2027-02-15 – 2027-03-05 · Team: Engineering · Phase: Build · after activities[4], activities[5] activities[7] Create app store assets: 2027-02-08 – 2027-02-19 · Team: Design · Phase: Build · after activities[4] activities[8] Build the launch page: 2027-02-22 – 2027-03-03 · Team: Marketing · Phase: Build · after activities[3], activities[7] activities[9] Beta test: 2027-03-08 – 2027-03-19 · Team: Engineering · Phase: Launch · after activities[6] activities[10] Fix beta feedback: 2027-03-22 – 2027-03-26 · Team: Engineering · Phase: Launch · after activities[9] activities[11] App store review: 2027-03-29 – 2027-04-02 · Team: Engineering · Phase: Launch · after activities[10] activities[12] Brief press and partners: 2027-03-29 – 2027-04-02 · Team: Marketing · Phase: Launch · after activities[8], activities[10] activities[13] Run the launch campaign: 2027-04-06 – 2027-04-16 · Team: Marketing · Phase: Launch · after activities[11], activities[12] activities[14] Review user feedback: 2027-04-26 – 2027-04-30 · Team: Design · Phase: Launch · after activities[13] milestones[0] Launch day: 2027-04-05 · after activities[11], activities[12] Fragment: 1030 of 1900 characters. ``` The summary shows every dependency in order and launch day after the app store review, so the agent answers: ```text Here is your launch plan in Tidigar: [Launch the new app](https://open.tidigar.com/s#t=1~n=Launch_the_new_app~d=From_goals_to_launch_day_and_the_first_weeks_after.~y=2027~m1=Team:Design,Engineering,Marketing~m2=Phase:Plan,Build,Launch~a1=Set_the_launch_goals/01-11/3/Marketing,Plan/100p~a2=Interview_users/01-14/9/Design,Plan/@a1~a3=Plan_the_architecture/01-14/7/Engineering,Plan/@a1~a4=Plan_the_campaign/01-14/14/Marketing,Plan/@a1~a5=Design_the_app/01-25/12/Design,Build/@a2~a6=Build_the_backend/01-21/23/Engineering,Build/@a3~a7=Build_the_app/02-15/19/Engineering,Build/@a5,a6~a8=Create_app_store_assets/02-08/12/Design,Build/@a5~a9=Build_the_launch_page/02-22/10/Marketing,Build/@a4,a8~a10=Beta_test/03-08/12/Engineering,Launch/@a7~a11=Fix_beta_feedback/03-22/5/Engineering,Launch/@a10~a12=App_store_review/03-29/5/Engineering,Launch/@a11~a13=Brief_press_and_partners/03-29/5/Marketing,Launch/@a9,a11~a14=Run_the_launch_campaign/04-06/11/Marketing,Launch/@a12,a13~a15=Review_user_feedback/04-26/5/Design,Launch/@a14~s1=Launch_day/04-05/@a12,a13~v=timeline/color:Team/group:Phase/start:01-11/end:04-30~c=15.1.0~!) I started on Monday 11 January and assumed a two-week beta and a week for the app store review. Launch day is 5 April; open the link to move anything, and the activities after it follow. ``` --- # Tidigar plans as JSON This is an optional format for scripts and new stored plans. To create or change a share link directly, use [llms.txt](https://tidigar.com/llms.txt). ## Plan ```json { "name": "Website launch", "dimensions": { "Team": ["Design", "Development"], "Phase": ["Plan", "Build"] }, "activities": [ { "title": "Requirements", "start": "2026-03-02", "end": "2026-03-13", "progress": 100, "values": { "Team": "Design", "Phase": "Plan" } }, { "title": "Design", "start": "2026-03-16", "end": "2026-04-03", "progress": 50, "values": { "Team": "Design", "Phase": "Plan" }, "dependsOn": ["Requirements"] }, { "title": "Build", "start": "2026-03-26", "end": "2026-05-15", "values": { "Team": "Development", "Phase": "Build" }, "dependsOn": ["Design"], "startAfter": [50] }, { "title": "Test", "start": "2026-05-18", "end": "2026-05-29", "values": { "Team": "Development", "Phase": "Build" }, "dependsOn": ["Build"] } ], "milestones": [{ "title": "Launch", "start": "2026-06-01", "dependsOn": ["Test"] }] } ``` - Unknown fields are errors; owners, status and categories belong in `values`. - `name` is required, 1–100 characters. Everything else is optional: `description` (500), `workDays` (`true` plans in work days), `dimensions`, `activities`, `milestones`, `periods` and `view`. - Dates are `YYYY-MM-DD`. `end` is inclusive; left out, the activity lasts one day. - `dimensions` maps a name to its options in order. An option is a name, or `{ "name": "Design", "color": "#4f7cff" }` for a stored plan; a link carries no colors. An activity's `values` names one option per dimension; an option no dimension lists is added. - `dependsOn` names any activity, milestone or period by its unique `key`, title or 0-based index (activities, milestones, periods). A period waits for nothing. - A record starts at least a day after an activity or period it depends on, and on or after a milestone. Weekends are allowed. - An activity’s `startAfter` is an array in the same order as `dependsOn`, for example `"dependsOn": ["Design", "Approval"], "startAfter": [50, 100]`. Values are `0`, `25`, `50`, `75` or `100`; missing entries mean `100`, and trailing `100` entries may be omitted. It cannot have more entries than `dependsOn`; milestones and periods require `100`. In the example, Design lasts 19 calendar days, so Build starts on March 26, after `ceil(19 × 50 / 100) = 10` days. - Builders preserve supplied dates. For a partial threshold, validation requires only that the successor does not start before the predecessor; it does not recalculate the work calendar. Choose dates that meet the intended threshold. Tidigar’s editor uses the exact threshold when scheduling. - Titles are at most 180 characters; milestones and periods need one. - `milestones`: `{ "title", "start" }`; `periods`: `{ "title", "start", "end" }`. Both take `key` and `values`. A period is time off: a plan in work days has no work days during it. - `view`: `type` is `"timeline"`, `"grid"`, `"list"` or `"flow"`; `groupBy`, `colorBy`, `rows` and `columns` take dimension names. Except for `groupBy`, they also take `"@progress"`. `start` and `end` set the timeline range. `layout` is `"classic"`, one activity per row under a label column as in MS Project, or `"compact"`, activities sharing rows; `style` is `"minimal"`, `"airy"`, `"contrast"` or `"terminal"`. Left out, the link opens a timeline over the plan's dates, grouped and colored by the first dimension, and its board has the first dimension as rows and the second as columns. - A link holds roughly 20–30 activities. If too large, shorten titles, drop descriptions or merge small activities and explain omissions. Never truncate a link. ## Build a link from JSON `https://tidigar.com/agents/v1/tidigar-link.mjs` validates a plan with the code Tidigar itself uses and writes its link, as one file for Node.js 20 or later, Deno or Bun. It runs entirely on your machine. ```sh curl -fSL -o tidigar-link.mjs https://tidigar.com/agents/v1/tidigar-link.mjs node tidigar-link.mjs plan.json ``` It prints the link, a summary with real dates and the fragment's length. `-` reads the plan from standard input. When the plan breaks a rule, it exits with an error that names the rule and the record: ```text Invalid activities[2] "Build".start: must be at least one day after dependency activities[1] "Design" ends ``` As a module: `import { createLink, readLink, embedCode } from './tidigar-link.mjs'`; `createLink(plan)` returns `{ url, fragment, length, limit, summary }`. ## Python and reading links The optional [Python builder](https://tidigar.com/agents/v1/tidigar_link.py) runs on Python 3.8 or later, without extra packages or an internet connection once downloaded: ```sh python3 tidigar_link.py plan.json ``` To edit a link through JSON instead of editing its records directly: ```sh node tidigar-link.mjs --read "" > plan.json python3 tidigar_link.py --read "" > plan.json ``` Edit the plan and run either builder again. `--read` reports any corrections made while reading; use the JavaScript module's `--validate ""` to check a finished link without rewriting it. Plan JSON v1 supports `t=1` links. Open `t=2` links in Tidigar to retain their baseline. `--embed plan.json` prints iframe code. The [plan schema](https://tidigar.com/agents/schema/plan-v1.json) describes the JSON fields; cross-record rules are checked by Tidigar and the builders. --- # Work on plans stored in Tidigar Use this guide when a user asks to save, find, open or change a plan stored in Tidigar or Tidigar Server, or gives a `/p/` link. A public chat assistant uses remote MCP with delegated OAuth authorization. The user's consent grants access; reading this guide or installing the skill does not. A stored plan is the original shared project. A `#t=1~…~!` link is an independent copy. Do not replace a requested save or update with a share link. If the destination is unclear, ask whether the user means the stored original or a separate copy before writing. ## Connect through remote MCP 1. Discover the Tidigar tools available in the assistant's host, including tools that the host loads on demand. If `tidigar_status` is available, call it with no arguments. Check its `server`, `organization`, `scope`, `role` and `writable` against the request. Proceed with a write only when `writable` is true; otherwise follow the access-failure guidance below. Do not infer authorization from a plan URL. 2. If no Tidigar connection exists, use the host's connector setup flow when it supports connecting during the conversation. Otherwise guide the user to add an MCP connection in the assistant's app or connector settings. The address is `https://app.tidigar.com/mcp`; for Tidigar Server it is the user's server origin followed by `/mcp`. See [connection setup](https://tidigar.com/agents/cloud#a-chat-assistant). 3. Let the host's MCP client handle OAuth discovery and authorization. It opens Tidigar for the user to sign in, check the assistant's name and return address, choose the organisation, and approve **Read only** or **Read and write**. Request writing only when the task changes stored data. Consent must come from the user, never from the agent acting on their behalf. 4. After authorization completes, discover the tools again and call `tidigar_status`. Resume the original task after checking the organisation and effective access. Each connection reaches one organisation. If it is the wrong one, have the user select or authorize the correct connection. The host keeps access and refresh tokens outside the conversation. Never ask for personal tokens, passwords or OAuth codes in chat, and never put them in prompts, files or shell commands. Do not replace this flow with the CLI, `TIDIGAR_TOKEN` or direct API calls. Coding agents with separately configured credentials use the [CLI and HTTP reference](https://tidigar.com/agents/stored-plans-cli.md). Instructions cannot install MCP tools in a host that has no connector support. If connection is unavailable, declined or fails, explain the connection step that remains and that no stored change was made. Continue after the host makes the authorized tools available; do not claim access or simulate a successful save. Offer a separate copy only if the user wants one. ## Find and read the original 1. Call `tidigar_list_plans` with no arguments. For a `/p/` link, match its URL to a returned plan's `url`, ignoring query and fragment. The code is not the plan ID. For a title, select the matching plan; ask if several match. If nothing matches, report it and check the intended organisation with the user. Do not guess an ID or search another organisation without access. 2. Call `tidigar_get_plan` with that `id`. Keep the returned `id`, `revision` and complete `project` for the update. Check its identity against the request. 3. Edit only the requested part of `project`. Preserve its project ID, record IDs, dimensions, saved views and unrelated content; new records need new UUIDs. Use the [roadmap file format](https://tidigar.com/agents/docs/file-format.md) for the fields you edit. Never rebuild an existing project from simplified plan JSON or a share link: that would lose its identities and views. An item's `assignee` is the organisation's member number for a person, not an account: keep it as read and assign with `tidigar_assign_activity`. ## Validate and save the change 1. Call `tidigar_validate_plan` with the edited `project`. It stores nothing. Compare its normalized `project` and `summary` to the user's request and fix validation errors before saving. Keep the original read revision. 2. Call `tidigar_update_plan` with the original `id`, original `revision`, validated `project` and `merge: true`. A successful result is the evidence that the change was saved; validation alone is not a save. 3. Return the stored plan's `url` and a short description of what was saved. The URL opens the original for signed-in members. Do not build a copy unless the user requested one. Changes are visible to other plan members. ### Concurrent edits and uncertain outcomes - `merge_conflicts`: nothing was saved. Explain each conflict (`id`, `about`, `change`, `base`, `mine`, `latest`) in plain words and ask the user which to keep. Never choose for them. Call `tidigar_resolve_merge` with the same plan `id`, original `revision` and complete edited `project` sent to the update, plus `choices` mapping every conflict ID to `mine` or `latest`. Remote MCP keeps no pending merge file. If new conflicts appear, ask about those and resend all choices until resolved. - `stale_revision`: get the current plan again, compare it with the version you read, redo the requested change while preserving others' work, validate and save against the new revision. Ask about incompatible changes. - `write_unknown` or a lost response to a write: the save may have happened. Read the plan and compare the stored result before attempting another write. If the result cannot be established, report the uncertainty; do not retry blindly or claim success. ## Access failures - `insufficient_scope`: the OAuth grant is read-only. Ask the host to authorize the connection again with **Read and write**, then check `tidigar_status` and reread the plan before saving. The host handles the MCP authorization challenge. - `invalid_token` or an expired or revoked connection: let the host refresh or reconnect through OAuth, then check status and reread the plan. A user who declined authorization has not approved a different access method. - `agent_access_off`, insufficient membership or `subscription_required`: explain the actual restriction. A write grant cannot override membership, subscription or the organisation owner's policy. Do not switch credentials or protocols to bypass it. `subscription_required` on a read means the organisation is not paid: its plans are unavailable until an owner subscribes, and the same connection works again afterwards. - `no_such_plan`: check the selected organisation and plan link with the user. - `rate_limited`: respect `retryAfter`. After an uncertain write, read before any retry. ## Create, delete or restore a stored plan - **Create:** use the [plan JSON reference](https://tidigar.com/agents/plan-json.md) for a new plan only. Call `tidigar_validate_plan` with `plan`, then `tidigar_create_plan` with the returned `project` so its ID stays stable. Return the saved plan's `url`. If creation's result is unknown, list/read and compare that ID before retrying. `plan_exists` is not permission to duplicate it; use `newId: true` only when the user asks for a new copy. - **Delete:** only when requested, confirm by plan name first. Read its current revision and call `tidigar_delete_plan` with `id` and `revision`. It moves to trash for 30 days. On `stale_revision`, read again and ask again. - **Restore:** call `tidigar_list_trash`, identify the requested plan, then `tidigar_restore_plan` with its `id`. ## Activities as tickets For Business and Server, a plan can work as a ticket list: give it a reference key prefix, a progress Board and a backlog List of undated work. 1. Resume with `tidigar_list_my_activities`. Search with `tidigar_list_activities` by plan and `ref` or across readable plans with `all: true`. For unassigned backlog use `assignee: ""`, `dated: false` and `progress: 0`. Open with `tidigar_get_activity`. Use the ID for ambiguous references. A milestone has `type: "milestone"`. 2. Claim with `tidigar_claim_activity`. On `activity_claimed`, report who holds it. Set `takeOver: true` only at the user's request. 3. Use `tidigar_update_activity` with the revision read and changed fields. Report 25, 50 or 75 as work advances. Ask the user about merge conflicts. 4. Comment with `tidigar_add_comment`. Record the result, verification and relevant commit or pull request. 5. Set progress to 100 when done. This records today as the finish unless the same request sends dates. If blocked, report the predecessor and required progress and leave the ticket open. [Report completion in List](https://tidigar.com/guides/board-list#report-completion-in-list). Create a ticket with `tidigar_add_activity`. Omit dates for backlog work. Write its specification as [Markdown source](https://tidigar.com/docs/file-format.html#item-activity) in `fields.description`. Read the same source back with `tidigar_get_activity`. An optional prefix selects its reference area. Use `tidigar_assign_activity` with an editor's account ID or an empty assignee to clear it. ## Baseline Activity and assigned-work reads include follow-up status and available tracking. Use `tidigar_save_baseline` with the plan revision, UTC capture time in whole seconds and a new view UUID. Up to 20 named baselines are kept: `manifest.baseline` is the active one and `earlier` the rest. `tidigar_create_baseline` saves a new active one; `tidigar_activate_baseline` and `tidigar_delete_baseline` take its `baselineId`. All keep views. Repeat the same inputs if the reply is lost. If the revision is stale, read the plan again. Start, end and estimated cost are the current values that the baseline is compared with. ## Comments Post a Markdown `body` as the user with `tidigar_add_comment`. Read newest first with `tidigar_list_comments` and pass `next` as `before` for older comments. Deleted comments have a null `body`. Agents never edit or delete comments. On `write_unknown`, read before retrying. ## Screens and stories A screen publishes one saved view to anyone holding its link, without an account. Confirm with the user before creating one or permanently ending one. Use `tidigar_list_screens`, `tidigar_create_screen`, `tidigar_update_screen`, `tidigar_get_screen_link` and `tidigar_delete_screen`. A screen's `view` is the saved view ID in the project's `sharedViews`; keep that ID when changing what it shows. Deleting the view ends the screen. Give a screen link only to the user, never put it in a project, file or public place. `agent_screens_off` means the owners reserve making screens and retrieving links for people. To replay schedule versions, match activities by meaning and store the latest version. Follow "A plan's history" in the [story language](https://tidigar.com/agents/docs/stories.md). Fix every `storyWarnings` entry before returning the screen link. ## Remote MCP arguments Use the host's tool calls, not shell commands. Fields marked `?` are optional; validation and creation take exactly one of `plan` or `project`. The tool schemas supplied by the server define field types and limits. | Tool | Arguments | | --- | --- | | `tidigar_status` | none | | `tidigar_list_plans` | none | | `tidigar_get_plan` | `id` | | `tidigar_validate_plan` | `plan?`, `project?` | | `tidigar_update_plan` | `id`, `revision`, `project`, `merge?` | | `tidigar_resolve_merge` | `id`, `revision`, `project`, `choices` | | `tidigar_create_plan` | `plan?`, `project?`, `newId?` | | `tidigar_delete_plan` | `id`, `revision` | | `tidigar_list_trash` | none | | `tidigar_restore_plan` | `id` | | `tidigar_list_screens` | `id` | | `tidigar_create_screen` | `id`, `view`, `name?`, `story?`, `joinCode?` | | `tidigar_update_screen` | `id`, `screen`, `name?`, `story?`, `joinCode?` | | `tidigar_get_screen_link` | `id`, `screen` | | `tidigar_delete_screen` | `id`, `screen` | | `tidigar_list_comments` | `id`, `activity`, `before?` | | `tidigar_add_comment` | `id`, `activity`, `body` | | `tidigar_list_my_activities` | none | | `tidigar_list_activities` | `id?`, `all?`, `ref?`, `prefix?`, `progress?`, `dated?`, `from?`, `through?`, `dimension?`, `value?`, `assignee?` | | `tidigar_get_activity` | `id`, `activity` | | `tidigar_save_baseline` | `id`, `revision`, `capturedAt`, `viewId` | | `tidigar_replace_baseline` | `id`, `revision`, `capturedAt` | | `tidigar_remove_baseline` | `id`, `revision` | | `tidigar_create_baseline` | `id`, `revision`, `baselineId`, `name`, `capturedAt` | | `tidigar_activate_baseline` | `id`, `revision`, `baselineId` | | `tidigar_delete_baseline` | `id`, `revision`, `baselineId` | | `tidigar_add_activity` | `id`, `fields`, `prefix?` | | `tidigar_update_activity` | `id`, `activity`, `revision`, `fields`, `choices?` | | `tidigar_assign_activity` | `id`, `activity`, `assignee` | | `tidigar_claim_activity` | `id`, `activity`, `takeOver?` | --- # Stored plans from a coding agent or script ## Plans stored in Tidigar Tidigar and Tidigar Server keep plans for an organisation. Use this section when the user asks to save, list, open or change a stored plan, or gives a `/p/` link. A link to that plan opens the shared plan; a share link opens a separate copy. The code is not the plan's id: list the organisation's plans and use the one whose `url` matches the link, ignoring anything after `?` or `#`. **A stored plan is not a share link.** For a new plan, use the optional [plan JSON format](https://tidigar.com/agents/plan-json.md): - You use the `tidigar` command or the HTTP API, never the link builders. - A stored plan is a full project with IDs, colors and saved views, as in the [roadmap file format](https://tidigar.com/agents/docs/file-format.md), not a `plan.json`. You change it by editing that project, never by rebuilding it from a plan, which would lose its IDs and views. - It is saved on a server and every member of the organisation sees your changes, often while they edit; a share link is stored nowhere. - Its `url` opens it only for signed-in members and holds no roadmap data. Never decode it or build a share link from it. This reference is for a coding agent running commands on a computer or in a configured environment. Public chat assistants use the [remote MCP and delegated OAuth guide](https://tidigar.com/agents/stored-plans.md) instead; do not ask a chat user for a personal token. Use the CLI when `tidigar status` exits 0. It keeps the token in the system's credential store. An environment configured with `TIDIGAR_TOKEN` may also use [HTTP](#stored-plans-over-http). If neither is configured, explain that no stored plan has been read, saved or changed. The user follows [connection setup](https://tidigar.com/agents/cloud) and enters credentials outside the chat. Never ask for a token in the chat, print it or write it to a file. A share-link copy is an alternative only for a new plan, never a substitute for a requested save or update. With the CLI signed in, the user can add the MCP tools, for example `claude mcp add tidigar -- tidigar mcp` (`tidigar mcp --read-only` offers no writes). All modes use the same JSON and errors as the [public API](https://tidigar.com/agents/docs/api.md). - **New plan:** write `plan.json` as in [the plan JSON reference](https://tidigar.com/agents/plan-json.md), run `tidigar plans validate plan.json`, check its summary, then `tidigar plans create plan.json`. Answer with the plan's `url`, which opens it for signed-in members. - **Change a plan:** `tidigar plans list` shows each `id`, also the end of its `url`. `tidigar plans get --out plan.json` saves its `revision` and `project`. Edit `project` per the roadmap file format, keeping IDs and giving new records new UUIDs, then `tidigar plans update plan.json --merge`. - Someone may save the plan while you work. `--merge` then combines both changes and saves. Exit 5 with `merge_conflicts` means both changed the same things and nothing was saved: stdout lists each conflict with an `id`, what it is `about`, the `change`, and the `base`, `mine` and `latest` values. Tell the user each conflict in plain words, ask which to keep, and never choose for them. Then run `tidigar plans resolve --choices '{"c1":"mine","c2":"latest"}'` with an answer for every conflict. If it lists new conflicts, ask about those the same way. - Exit 5 with `stale_revision`: the plan changed and could not be merged. Get it again, show the user what changed, redo your edit and update again; never overwrite the other change. - **Delete a plan** only when the user asks, and confirm first by its name. `tidigar plans get ` gives its `revision`; `tidigar plans delete --revision ` moves it to the trash, where it stays 30 days. Exit 5 with `stale_revision`: someone changed it since; get it again and ask again. `tidigar plans trash` lists deleted plans and `tidigar plans restore ` brings one back. - Run `tidigar activities mine`, `tidigar activities list ` or `tidigar activities get ` for follow-up and tracking. Keep the project's `assignee` as read. It holds the organisation member number. - `tidigar plans save-baseline --revision --captured-at --view-id ` captures the baseline and creates a Follow-up List if no saved List shows tracking columns. Keep the same inputs for retries. - `tidigar plans create-baseline --revision --baseline-id --name --captured-at ` saves a new active baseline. `activate-baseline` and `delete-baseline` take `--revision` and `--baseline-id`. Keep the same inputs for retries. - `tidigar activities complete --revision ` marks work complete. - **Comments:** tell the team what was done, decided or found on an activity, as the user: `tidigar comments add note.md` posts the file's Markdown, and `tidigar comments list ` reads the thread newest first (`--before ` for older ones). Link commits and pull requests; write what a colleague needs, not a log of steps. Exit 7 means the outcome is unknown: list the comments before adding it again. Agents never edit or delete comments. - **Screens:** a screen shows one saved view of a stored plan to anyone with its link, on a wall screen or a web page, and may play a story written in the [story language](https://tidigar.com/agents/docs/stories.md) with the plan's own titles and dates. `tidigar screens list ` lists them. `tidigar screens create --view --name --story story.txt` makes one, `--name` and `--story` optional; ask the user first, since anyone with its link sees that view. `tidigar screens update ` changes its `--story` file, `--name` or `--join-code on|off`. To change what a screen shows, update its saved view in the project and keep the view's `id`: deleting the view ends the screen. `tidigar screens link ` prints its `url`; give it only to the user, never write it into a plan, a file or a public place. `tidigar screens delete ` ends the link for good; confirm first. Exit 3 with `agent_screens_off`: the owners keep making screens and reading links to people. - **A plan's history as a story:** read all schedule versions and match activities by meaning. Store the latest version. Follow "A plan's history" in the story language to replay earlier versions on a screen, starting at `0:00` without animation. Give each later meeting its own moment four to six seconds apart and caption its changes. End on the stored plan and `loop()`. Fix every `storyWarnings` entry and update until the list is empty before returning the link. - Exit 7 (`write_unknown`): the write may or may not be saved. Get the plan and report what it holds; never repeat a write blindly. - Exit 2: ask the user to run `tidigar login`. Exit 3: read-only token, viewer or no subscription. Exit 4: no such plan. Exit 5 with `plan_exists`: it already exists; `--new-id` saves a copy if the user wants one. Exit 6: too large. ### Stored plans over HTTP The token stays in the environment, never in a command, output or the chat. `TIDIGAR_SERVER` names a Tidigar Server. ```sh API="${TIDIGAR_SERVER:-https://app.tidigar.com}/api/v1" AUTH="Authorization: Bearer $TIDIGAR_TOKEN" JSON="Content-Type: application/json" curl -sS -H "$AUTH" "$API/token" curl -sS -H "$AUTH" "$API/organizations/$ORG/plans" curl -sS -X POST -H "$AUTH" -H "$JSON" --data-binary @body.json "$API/organizations/$ORG/plans/validate" curl -sS -X POST -H "$AUTH" -H "$JSON" --data-binary @body.json "$API/organizations/$ORG/plans" curl -sS -H "$AUTH" "$API/organizations/$ORG/plans/$PLAN_ID" curl -sS -X PUT -H "$AUTH" -H "$JSON" -H "If-Match: \"$REVISION\"" --data-binary @body.json "$API/organizations/$ORG/plans/$PLAN_ID" curl -sS -X POST -H "$AUTH" -H "$JSON" --data-binary @merge.json "$API/organizations/$ORG/plans/$PLAN_ID/merge" curl -sS -X DELETE -H "$AUTH" -H "If-Match: \"$REVISION\"" "$API/organizations/$ORG/plans/$PLAN_ID" curl -sS -H "$AUTH" "$API/organizations/$ORG/trash" curl -sS -X POST -H "$AUTH" "$API/organizations/$ORG/trash/$PLAN_ID/restore" curl -sS -H "$AUTH" "$API/organizations/$ORG/plans/$PLAN_ID/screens" curl -sS -X PATCH -H "$AUTH" -H "$JSON" --data-binary @screen.json "$API/organizations/$ORG/plans/$PLAN_ID/screens/$SCREEN_ID" curl -sS -H "$AUTH" "$API/organizations/$ORG/plans/$PLAN_ID/screens/$SCREEN_ID/link" ``` - `GET /token`: `organization.id` is `ORG`; `writable` says whether you may save; `readable: false` means the organisation is not paid and its plans answer `402`. `GET /organizations/:org/plans` lists plans. - New plan: send `{ "plan": … }` to `POST /organizations/:org/plans/validate`, which answers `{ project, summary }`, then create with `{ "project": … }` to keep its ID. - Change: `GET /organizations/:org/plans/:id`, edit `project`, and send `{ "project": … }` to `PUT /organizations/:org/plans/:id` with the read `revision` as `REVISION`. - Someone saved first (`stale_revision`): send `{ "base": REVISION, "project": … }` to `POST /organizations/:org/plans/:id/merge`, which combines both changes and saves. `merge_conflicts` lists `conflicts` as for the CLI, each with its own `id`: ask the user about each, then send the same body with `"choices": { "": "mine" | "latest" }` for every conflict so far, until it saves. - Delete, after the user confirms: `DELETE /organizations/:org/plans/:id` with the read `revision` as `REVISION` moves it to the trash for 30 days. `GET /organizations/:org/trash` lists deleted plans; `POST /organizations/:org/trash/:id/restore` brings one back. - Errors are `{ "error": { "code", "message" } }`. `stale_revision` also carries the latest `plan`; if `merge` answers `no_such_revision`, redo your edit on it. After a lost answer, or `plan_exists` on a retried create, get the plan and compare before writing. --- # Reference: the share link specification The quick start is enough to write and change ordinary links directly. This specification covers edge cases and the complete opening behavior. --- # Tidigar share link specification See [sharing a roadmap as a link](https://tidigar.com/guides/sharing) for the Share link dialog. Public pre-release specification, versions 1 and 2. A readable link carries an editable roadmap as plain text records and opens without an account. Hamacher Software AB publishes this specification under [CC BY 4.0](https://creativecommons.org/licenses/by/4.0/). The keywords **MUST**, **MUST NOT**, **SHOULD** and **MAY** are normative. The roadmap model, its field rules and limits are defined in the [Tidigar Roadmap Interoperability Specification](https://tidigar.com/agents/docs/file-format.md). ## Link format ```text https://open.tidigar.com/s#t=1~~~…~! ``` Links open in the web app or in an installed Tidigar app that claims the link. Until the opener is deployed, use `https://app.tidigar.com/#t=1~…` for the web app. - The fragment starts with `t=1` or `t=2`. Records follow, each after a `~`, as `key=value` or a one-letter flag, in any order. `!` ends the link. - The whole link SHOULD stay within **2,000 characters**: the fragment within **1,900**. Share larger roadmaps as project files. - Browsers keep the fragment on the device when requesting the page. ## Records | Record | Holds | | ----------------------- | ------------------------------------------------------------- | | `n=Name` | the roadmap's name, required | | `d=Text` | its description | | `y=2026` | its year, required: the year of every `MM-DD` date | | `w` | plans in work days: Monday to Friday, without periods | | `u=thousands` | display costs in thousands | | `k=SEK` | the plan currency for estimated costs, when present | | `r=KEY` | the reference key prefix, up to 10 capital letters and digits | | `m1=Team:Design,Build` | a dimension and its options, in order | | `a1=title/start/days/…` | an activity | | `s1=title/date/…` | a milestone | | `p1=title/start/days` | a period | | `v=timeline/…` | the view the roadmap opens in | | `c=3.1.1` | the number of activities, milestones and periods | Numbered records count from 1: `a1`, `a2`, … A link MUST NOT skip a number, and `c=` MUST give the counts, so a missing record or a cut link is noticed. ### Activities ```text a3=Install_new_unit/11-02/5/Installer,Install/@a2,s2/50p/d=Ask_for_permits ``` - **Title**, then **start** (`MM-DD` always uses `y`; `YYYY-MM-DD` can use any year), then **days** (`1` for a single day). Work-day plans skip weekends and periods. For undated work use `-/-` for start and days, as in `a1=Request_quotes/-/-`. - Then, in any order: - **Options** by name, comma-separated, one per dimension in `m1`, `m2`, … order. When a name belongs to several dimensions, its position selects the dimension: with `m1=Team:Network,Servers` and `m2=Phase:Inventory,Network`, `Network,Network` sets both Team and Phase to Network. Empty positions are allowed: `,Network` sets only Phase. Unique names also work in any order. To select a dimension explicitly, write `Team:Network` or `Phase:Network`; the prefix takes priority over position. If a shared name does not match its position, Tidigar reports the ambiguity and uses the first matching dimension. - **Dependencies** after `@`, comma-separated, by key, such as `@a1,s2,p1`. The activity starts after each ends, or on a milestone's date; `@a1:50` lets it start once 50% of `a1`'s planned days have passed (`0`, `25`, `50` or `75`). Links involving undated activities preserve dependency order without constraining dates or allowing overlap shares. Dependencies MUST NOT form a cycle. - **Estimated cost** as `cost=1250000` in the currency’s minor units. Set the plan currency with `k=SEK` (also supports EUR, USD, GBP, NOK and DKK). Omit the field for an unestimated activity. - **Progress** as `0p`, `25p`, `50p`, `75p` or `100p`. An option whose name looks like this is written with its dimension, such as `Size:50p`. - `d=` carries the activity's [Markdown source](https://tidigar.com/agents/docs/file-format.md#item-activity). Preserve whitespace and line breaks with the text escapes below. The fragment limit applies to the whole link. ### Milestones and periods ```text s1=Heat_pump_in_operation/11-09/@a3 s2=Contract_signed/10-30/fixed p1=Autumn_break/10-26/5 ``` - A milestone has a title and a date, or `-`, then `@` and what it waits for; `fixed` marks an event on a set date, such as a decision. - A period is a titled band across the timeline, such as a holiday: title, start and days. It is time off, without work days. ### Dimensions and the view - `m1=Team:Household,Installer` defines ordered options with standard colors. - `v=` selects `timeline`, `board`, `list` or `flow`. Use dimension names and dates, as in `v=timeline/color:Team/group:Phase/start:10-01/end:12-31`. Board uses `rows:` and `columns:`. Add `costs` to show totals, with optional List grouping as in `v=list/costs/cost-group:Team`. - Timeline layout is `classic` (one activity per row, fixed labels and reference keys) or `compact` (shared rows). Styles are `minimal`, `airy`, `contrast` and `terminal`. A layout or style alone selects the timeline, as in `v=classic`. Use `progress` for rows or columns and `@progress` or `@follow-up-status` for color. Links omit assignee settings. ### Text - `_` is a space. - In a title, a note or a name, write these characters escaped: `~` `%7E`, `/` `%2F`, `_` `%5F`, `%` `%25`, `&` `%26`, `#` `%23`, `(` `%28`, `)` `%29`, `"` `%22`, `<` `%3C`, `>` `%3E`, backtick `%60`, `{` `%7B`, `}` `%7D`, `[` `%5B`, `]` `%5D`, vertical bar `%7C`, backslash `%5C` and `^` `%5E`. Encode a line feed as `%0A`, a carriage return as `%0D` and a tab as `%09`. In a dimension or option name also escape `,` `%2C`, `:` `%3A`, `@` `%40` and `=` `%3D`. - Other characters, such as å, ä, ö or `–`, are written as they are. - Titles are up to 180 characters, names up to 100, the roadmap's description up to 500. ## Tracking records Use `t=2` for a readable link with a baseline. Its other records follow the same grammar as version 1. Tracking fields are separated with `/` and write missing values as `-`. - `b=/` starts a baseline. It may have no rows. - `b1=////` records one baseline row. Repeat as `b2`, `b3` and so on. The removed work's UUID stands in for a work key. Milestones put their planned moment in start and leave the end and budget absent. Append optional `//<ref>` fields for the captured strings. A missing title before a reference key is `-`. Encode the literal string `-` as `%2D` in either field, and use the same text escapes as other readable fields. Use full dates `YYYY-MM-DD` or local minutes `YYYY-MM-DDTHH:mm` for tracking values, minor units for budgets, and whole seconds in the UTC timestamp. Zero survives a copy. Compact copy links with tracking use `s=2`; other compact links use `s=1`. Full copies include historical baseline rows and give live records new IDs. The default copy omits tracking and uses `s=1`. To include tracking, turn off **Leave out the baseline**. A visible-only copy limits baseline rows to copied records. The readable Timeline setting `baseline` shows the baseline layer, and compact links keep it. Published screens carry only tracking approved at publication and used by the view. Both carry only the active baseline's dates and budgets. Links carry no actual or forecast values; a reader ignores older `x` records and the `actuals` Timeline setting. ## Example ```text https://open.tidigar.com/s#t=1~n=Heat_pump_replacement~y=2026~w~m1=Team:Household,Installer~m2=Phase:Plan,Install~a1=Review_current_system/10-12/3/Household,Plan~a2=Request_quotes/10-15/6/Household,Plan/@a1~a3=Install_new_unit/11-02/5/Installer,Install/@a2,s2~s1=Heat_pump_in_operation/11-09/@a3~s2=Contract_signed/10-30/fixed~p1=Autumn_break/10-26/5~v=timeline/color:Team/group:Phase~c=3.2.1~! ``` Installation waits for quotes and the signed contract. The work-day timeline groups by Phase and colors by Team. ## Opening a link Tidigar copies the roadmap into the recipient's library with new record IDs. Reopening the same link on a device selects that copy. Activities and milestones get reference keys in link order (`WL-1`, `WL-2`), using `r=` or a prefix derived from the plan name. The first saved view is Classic, framed by the earliest and latest activity or milestone dates with three days of margin on each side. Later periods remain visible. The plan opens in `v=` when present and Classic by default. Tidigar reports repairs by record, such as clearing an unknown option or moving an activity after its dependency. For irremediable input such as `a1: start "02-30" is not a date`, Tidigar refuses the link and lists every problem. Repairs preserve all activities, milestones and periods. Open Tidigar's compressed links (`#s=1.…` or `#s=2.…`) in the app. ## Optional validation To check a finished link locally: ```sh node tidigar-link.mjs --validate "<finished URL>" ``` The module reports dates, dependencies, counts, fragment length and corrections. It leaves the link unchanged. Exit 0 means it opens without corrections. Exit 1 means invalid input, corrections or a fragment over 1,900 characters. ## Building a link from JSON The [agent guide](https://tidigar.com/agents) links to the Plan JSON v1 schema and local builders. The builders validate the plan and print the link, dated summary and fragment length, or name the invalid rule and record. `--read <link>` prints Plan JSON from a `t=1` link. The module exports `createLink(plan)`, `readLink(link)` and `embedCode(link, title)`. See [llms.txt](https://tidigar.com/llms.txt) for direct authoring and worked examples.