"""Readable Tidigar links (#t=1~...) from plans: https://tidigar.com/llms.txt python3 tidigar_link.py plan.json build a link; - reads standard input python3 tidigar_link.py --read LINK print a link's roadmap as a plan""" import datetime, json, re, sys, urllib.parse OPENER = "https://open.tidigar.com/s" COLORS = ["4f7cff", "16a34a", "f59e0b", "8a52c1", "0891b2", "dc5f5f", "64748b", "db2777"] PERIOD_COLOR = "9aa7b5" VIEW = {"type": "view", "groupBy": "group", "colorBy": "color", "rows": "row", "columns": "col", "start": "timelineStart", "end": "timelineEnd", "layout": "timelineActivityRows", "style": "presentationStyle"} # classic: one activity per row under a fixed label, as in MS Project; compact: shared rows. LAYOUTS = {"classic": "single-label", "compact": "compact"} STYLES = ["standard", "minimal", "airy", "contrast", "terminal"] KEYS = {"plan": ["$schema", "version", "name", "description", "costCurrency", "costUnit", "workDays", "dimensions", "activities", "milestones", "periods", "view"], "activity": ["key", "title", "start", "end", "description", "estimatedCostMinor", "progress", "values", "dependsOn", "startAfter"], "milestone": ["key", "title", "start", "values", "dependsOn", "fixed"], "period": ["key", "title", "start", "end", "values"], "option": ["name", "color"], "view": list(VIEW)} AXES = {"rows": "row", "columns": "col", "color": "color", "group": "group"} MODES = {"grid": "board", "timeline": "timeline", "list": "list", "flow": "flow"} def fail(path, message): raise ValueError(f"Invalid {path}: {message}") def q(text): return json.dumps(text, ensure_ascii=False) def named(path, record): title = record.get("title") if isinstance(record, dict) else None if isinstance(title, str) and len(title) > 40: title = title[:40] + "…" return f"{path} {q(title)}" if isinstance(title, str) and title else path def record(value, path, kind): if not isinstance(value, dict): fail(path, "expected an object") for key in value: if key not in KEYS[kind]: hint = '. Dimension options go in values, such as "values": { "Team": "Design" }' fail(f"{path}.{key}", "unknown field; use " + ", ".join(KEYS[kind]) + (hint if kind == "activity" else "")) return value def items(value, path): if value is None: return [] if not isinstance(value, list): fail(path, "expected an array") return value def text(value, path, limit, required=False): if not isinstance(value, str): fail(path, "expected text") if required and not value.strip(): fail(path, "must not be empty") if len(value.encode("utf-16-le")) // 2 > limit: fail(path, f"at most {limit} characters") return value def day(value, path): try: assert re.fullmatch(r"\d{4}-\d{2}-\d{2}", value) and "1900" <= value <= "2200-12-31" return datetime.date.fromisoformat(value).toordinal() except (AssertionError, TypeError, ValueError): fail(path, "expected a date as YYYY-MM-DD") def iso(ordinal): return datetime.date.fromordinal(ordinal).isoformat() def flag(value, path): if value is not None and not isinstance(value, bool): fail(path, "expected true or false") return value def color(value, path): if not isinstance(value, str) or not re.fullmatch(r"#?[0-9a-fA-F]{6}", value): fail(path, "expected a color as #rrggbb") return value.lstrip("#").lower() def to_payload(plan): """A plan's share-link payload, after checking every rule a link must meet.""" record(plan, "plan", "plan") if plan.get("version", 1) != 1: fail("version", "must be 1") name = text(plan.get("name"), "name", 100, True) currency = plan.get("costCurrency") if "costCurrency" in plan and currency not in ("SEK", "EUR", "USD", "GBP", "NOK", "DKK"): fail("costCurrency", "expected a supported currency") unit = plan.get("costUnit") if "costUnit" in plan and (unit != "thousands" or not currency): fail("costUnit", "expected thousands and a cost currency") dims = {} # dimension name -> [[option, color], ...], in order def dimension(key, path): if key not in dims: if not key.strip() or len(dims) == 20: fail(path, "a dimension needs a name; at most 20 dimensions") dims[key] = [] return dims[key] # Colors matter in a stored plan; a link carries none. def add(options, option, shade, path): text(option, path, 100) if any(known == option for known, _ in options): fail(path, f"{q(option)} is listed twice") if len(options) == 100: fail(path, "at most 100 options") options.append([option, shade or COLORS[len(options) % len(COLORS)]]) if not isinstance(plan.get("dimensions", {}), dict): fail("dimensions", "expected an object of name -> options") for key, options in plan.get("dimensions", {}).items(): path = f"dimensions.{q(key)}" for index, option in enumerate(items(options, path)): at = f"{path}[{index}]" if isinstance(option, str): add(dimension(key, path), option, None, at) else: record(option, at, "option") shade = color(option["color"], f"{at}.color") if "color" in option else None add(dimension(key, path), option.get("name"), shade, f"{at}.name") dimension(key, path) acts = [record(a, named(f"activities[{i}]", a), "activity") for i, a in enumerate(items(plan.get("activities"), "activities"))] points = [record(m, named(f"milestones[{i}]", m), "milestone") for i, m in enumerate(items(plan.get("milestones"), "milestones"))] bands_in = [record(p, named(f"periods[{i}]", p), "period") for i, p in enumerate(items(plan.get("periods"), "periods"))] # Any activity or milestone may wait for any record, by title (activities first, # then milestones, then periods) or by index: activities, then milestones, then periods. kinds = [("activities", acts), ("milestones", points), ("periods", bands_in)] total = len(acts) + len(points) + len(bands_in) titles, offset = [], 0 for kind, records in kinds: found = {} for i, r in enumerate(records): if isinstance(r.get("title"), str): found[r["title"]] = -1 if r["title"] in found else offset + i titles.append((kind, found)) offset += len(records) # A key names one record for dependsOn, whatever its title; it is not kept. keys, offset = {}, 0 for kind, records in kinds: for i, r in enumerate(records): if "key" not in r: continue at = f"{kind}[{i}].key" key = r["key"] if not isinstance(key, str) or not key.strip() or len(key) > 100: fail(at, "expected text of 1–100 characters") if key in keys: fail(at, f"{q(key)} is used twice") keys[key] = offset + i offset += len(records) def depends(value, path): found = [] for position, ref in enumerate(items(value, path)): at = f"{path}[{position}]" if isinstance(ref, int) and not isinstance(ref, bool): if not 0 <= ref < total: fail(at, f"there is no record {ref}") index = ref elif not isinstance(ref, str): fail(at, "expected a key, a title or an index") elif ref in keys: index = keys[ref] else: kind, named_ = next(((k, n) for k, n in titles if ref in n), (None, None)) if kind is None: fail(at, f"no activity, milestone or period has the key or title {q(ref)}") if named_[ref] < 0: fail(at, f"several {kind} are titled {q(ref)}; use an index") index = named_[ref] if index in found: fail(at, "duplicate dependency") found.append(index) return found # A record's values: dimension position -> option number. def values_of(r, path): values = {} if not isinstance(r.get("values", {}), dict): fail(f"{path}.values", "expected dimension -> option") for key, option in r.get("values", {}).items(): at = f"{path}.values.{q(key)}" options = dimension(key, at) if option is None or option == "": continue if option not in [known for known, _ in options]: add(options, option, None, at) values[list(dims).index(key)] = [known for known, _ in options].index(option) + 1 return values packed = lambda v: [v.get(k, 0) for k in range(max(v, default=-1) + 1)] dated, rows, marks, bands = [], [], [], [] for i, a in enumerate(acts): path = named(f"activities[{i}]", a) start = day(a.get("start"), f"{path}.start") end = day(a["end"], f"{path}.end") if "end" in a else start if end < start: fail(f"{path}.end", "must not be before start") progress = a.get("progress", 0) if progress not in (0, 25, 50, 75, 100) or isinstance(progress, bool): fail(f"{path}.progress", "must be one of 0, 25, 50, 75, or 100") values = values_of(a, path) dep = depends(a.get("dependsOn"), f"{path}.dependsOn") shares = a.get("startAfter", []) if not isinstance(shares, list): fail(f"{path}.startAfter", "expected an array") shares = shares[:] if len(shares) > len(dep): fail(f"{path}.startAfter", "must not have more entries than dependsOn") for position, share in enumerate(shares): if isinstance(share, bool) or share not in (0, 25, 50, 75, 100): fail(f"{path}.startAfter[{position}]", "must be one of 0, 25, 50, 75, or 100") if share != 100 and dep[position] >= len(acts): fail(f"{path}.startAfter[{position}]", "a milestone or a period requires 100") while shares and shares[-1] == 100: shares.pop() amount = a.get("estimatedCostMinor") if "estimatedCostMinor" in a: if type(amount) not in (int, float) or not 0 <= amount <= 99_999_999_999 or amount != int(amount): fail(f"{path}.estimatedCostMinor", "expected a non-negative amount in minor units") if currency is None: fail("costCurrency", "required when an activity has an estimated cost") amount = int(amount) dated += [start, end] rows.append([text(a.get("title", ""), f"{path}.title", 180), start, end - start, text(a.get("description", ""), f"{path}.description", 10**6), progress, values, dep, path, shares, amount]) for i, m in enumerate(points): path = named(f"milestones[{i}]", m) date = day(m.get("start"), f"{path}.start") flag(m.get("fixed"), f"{path}.fixed") dated.append(date) marks.append([text(m.get("title"), f"{path}.title", 180, True), date, depends(m.get("dependsOn"), f"{path}.dependsOn"), 1 if m.get("fixed") else 0, path, values_of(m, path)]) for i, p in enumerate(bands_in): path = named(f"periods[{i}]", p) start = day(p.get("start"), f"{path}.start") end = day(p["end"], f"{path}.end") if "end" in p else start if end < start: fail(f"{path}.end", "must not be before start") dated += [start, end] bands.append([text(p.get("title"), f"{path}.title", 180, True), start, end - start, values_of(p, path)]) flag(plan.get("workDays"), "workDays") # Every record in link order: [path, start, end or None for a milestone, dependsOn, # shares, fixed]. A period waits for nothing. linked = ([[r[7], r[1], r[1] + r[2], r[6], r[8], 0] for r in rows] + [[m[4], m[1], None, m[2], [], m[3]] for m in marks] + [[named(f"periods[{i}]", bands_in[i]), b[1], b[1] + b[2], [], [], 0] for i, b in enumerate(bands)]) # Partial dependencies permit overlap, so date ordering alone cannot rule out cycles. visiting, visited = set(), set() def visit(index): if index in visited: return if index in visiting: fail(f"{linked[index][0]}.dependsOn", "dependency cycle") visiting.add(index) for parent in linked[index][3]: visit(parent) visiting.remove(index) visited.add(index) for index in range(len(linked)): visit(index) # Stored dates are preserved; a record starts no earlier than each predecessor's end, # a milestone's date, or with a share, its start. A fixed milestone keeps its date. for path, start, _, after, shares, fixed in linked: if fixed: continue for position, index in enumerate(after): parent = linked[index] if position < len(shares) and shares[position] < 100: if start < parent[1]: fail(f"{path}.start", f"must not be before dependency {parent[0]} starts") elif parent[2] is None: if start < parent[1]: kind = "fixed milestone" if parent[5] else "milestone" fail(f"{path}.start", f"must not be before {kind} {parent[0]}") elif start <= parent[2]: fail(f"{path}.start", f"must be at least one day after dependency {parent[0]} ends") year = datetime.date.fromordinal(min(dated)).year if dated else datetime.date.today().year base = datetime.date(year, 1, 1).toordinal() def trim(values, defaults): while values and values[-1] == defaults[len(values) - 1]: values.pop() return values payload = {"n": name, "y": year, "c": datetime.datetime.now(datetime.timezone.utc).strftime("%Y-%m-%dT%H:%M:%SZ")} if "description" in plan: payload["d"] = text(plan["description"], "description", 500) if currency is not None: payload["k"] = currency if unit is not None: payload["u"] = unit if plan.get("workDays"): payload["w"] = 1 if dims: payload["m"] = [[key, options] for key, options in dims.items()] if rows: payload["i"] = [trim([t, s - base, n, d, pr, packed(v), dep, shares, "", amount], [None, None, None, "", 0, [], [], [], "", None]) for t, s, n, d, pr, v, dep, _, shares, amount in rows] if marks: payload["s"] = [trim([t, d - base, dep, f, "", "", 0, packed(v)], [None, None, [], 0, "", "", 0, []]) for t, d, dep, f, _, v in marks] if bands: # The fourth and fifth places are not read: every period is time off, colored by its values. payload["p"] = [trim([t, s - base, n, PERIOD_COLOR, 1, "", "", packed(v)], [None] * 4 + [1, "", "", []]) for t, s, n, v in bands] view = record(plan.get("view", {}), "view", "view") o = {} for key, field in VIEW.items(): if key not in view: continue value = view[key] if key == "type": if value not in ("timeline", "grid", "list", "flow"): fail("view.type", "must be timeline, grid, list, flow") o["view"] = value elif key in ("start", "end"): o[field] = iso(day(value, f"view.{key}")) elif key == "layout": if value not in LAYOUTS: fail("view.layout", "must be classic or compact") o[field] = LAYOUTS[value] elif key == "style": if value not in STYLES: fail("view.style", "must be " + ", ".join(STYLES)) o[field] = value elif value is None or value == "": o[field] = "" elif field == "color" and value == "@follow-up-status": o[field] = "follow-up-status" elif field in ("row", "col", "color") and value == "@progress": o[field] = "progress" elif value not in dims: fail(f"view.{key}", f"there is no dimension {q(value)}") else: o[field] = list(dims).index(value) o.setdefault("view", "timeline") if dims: if o["view"] == "grid": o.setdefault("row", 0) if len(dims) > 1: o.setdefault("col", 1) o.setdefault("color", 0) if o["view"] == "timeline": o.setdefault("group", 0) if dated: o.setdefault("timelineStart", iso(min(dated))) o.setdefault("timelineEnd", iso(max(dated))) if o["timelineEnd"] < o["timelineStart"]: fail("view.end", "must not be before view.start") payload["o"] = o return payload ESCAPED = set('%~/_&#"<>`(){}[]|\\^') def field(value, also=""): """Text in a field: a space is _, and what would split a field is escaped.""" return "".join("_" if c == " " else urllib.parse.quote(c, safe="") if c in ESCAPED or c in also or c.isspace() else c for c in str(value)).replace("~", "%7E") def name(value): return field(value, ",:@=") def size(text): """Characters as JavaScript and browsers count them: UTF-16 code units.""" return len(text.encode("utf-16-le")) // 2 def link(payload): """The readable link of a checked payload: t=1~...~!""" if "b" in payload: raise ValueError("Plan JSON v1 cannot represent a baseline. Open the link in Tidigar to keep its tracking data.") year = payload["y"] base = datetime.date(year, 1, 1).toordinal() dims, rows, marks, bands = payload.get("m", []), payload.get("i", []), payload.get("s", []), payload.get("p", []) def date(offset): value = iso(base + offset) return value[5:] if value.startswith(f"{year}-") else value vacations = [(p[1], p[1] + p[2]) for p in bands] def working(offset): return datetime.date.fromordinal(base + offset).weekday() < 5 and not any(a <= offset <= b for a, b in vacations) def days(start, length): if payload.get("w") != 1: return length + 1 return max(1, sum(1 for d in range(start, start + length + 1) if working(d))) def key(index): if index < len(rows): return f"a{index + 1}" if index < len(rows) + len(marks): return f"s{index - len(rows) + 1}" return f"p{index - len(rows) - len(marks) + 1}" out = ["t=1", f"n={field(payload['n'])}"] if payload.get("d"): out.append(f"d={field(payload['d'])}") out.append(f"y={year}") if payload.get("w") == 1: out.append("w") if payload.get("k"): out.append(f"k={field(payload['k'])}") if payload.get("u"): out.append(f"u={field(payload['u'])}") for k, (dim, options) in enumerate(dims): out.append(f"m{k + 1}={name(dim)}:" + ",".join(name(o) for o, _ in options)) for k, row in enumerate(rows): title, start, length, description, progress, values, after, shares = (row + ["", 0, 0, "", 0, [], [], []][len(row):])[:8] parts = [field(title), date(start), str(days(start, length))] chosen = [] for d, v in enumerate(values): if v: option = dims[d][1][v - 1][0] shared = any(option == o for e, (_, opts) in enumerate(dims) if e != d for o, _ in opts) chosen.append(f"{name(dims[d][0])}:{name(option)}" if shared or re.fullmatch(r"\d+p", option) else name(option)) if chosen: parts.append(",".join(chosen)) if after: parts.append("@" + ",".join(key(x) + (f":{shares[i]}" if i < len(shares) and shares[i] != 100 else "") for i, x in enumerate(after))) if progress: parts.append(f"{progress}p") if len(row) > 9: parts.append(f"cost={row[9]}") if description: parts.append(f"d={field(description)}") out.append(f"a{k + 1}=" + "/".join(parts)) for k, m in enumerate(marks): parts = [field(m[0]), date(m[1])] if m[3:4] == [1]: parts.append("fixed") if len(m) > 2 and m[2]: parts.append("@" + ",".join(key(x) for x in m[2])) out.append(f"s{k + 1}=" + "/".join(parts)) for k, p in enumerate(bands): out.append(f"p{k + 1}={field(p[0])}/{date(p[1])}/{p[2] + 1}") o = payload.get("o") if o: parts = [MODES[o.get("view", "grid")]] parts += [word for word, rows in LAYOUTS.items() if o.get("timelineActivityRows") == rows] parts += [o["presentationStyle"]] if o.get("presentationStyle", "standard") != "standard" else [] for axis, f in AXES.items(): if f == "color" and o.get(f) == "follow-up-status": parts.append("color:@follow-up-status") elif o.get(f) == "progress": parts.append(f"{axis}:{'@' if f == 'color' else ''}progress") elif isinstance(o.get(f), int): dimension = name(dims[o[f]][0]) parts.append(f"{axis}:{'%70rogress' if dimension == 'progress' and f in ('row', 'col') else dimension}") for edge, f in (("start", "timelineStart"), ("end", "timelineEnd")): if o.get(f): parts.append(f"{edge}:{date(datetime.date.fromisoformat(o[f]).toordinal() - base)}") out.append("v=" + "/".join(parts)) out += [f"c={len(rows)}.{len(marks)}.{len(bands)}", "!"] fragment = "~".join(out) if size(fragment) > 1900: raise ValueError(f"The roadmap is too large for a link. It needs {size(fragment)} of 1900 characters; " "shorten titles, drop descriptions and merge small activities.") return f"{OPENER}#{fragment}" def payload_of(url): """A readable link's payload. Raises an error naming every record that cannot be read.""" fragment = url.split("#", 1)[-1].split("&", 1)[0] records = fragment.split("~") if records[0] == "t=2": raise ValueError("Plan JSON v1 cannot represent a baseline. Open the link in Tidigar to keep its tracking data.") if records[0] != "t=1": raise ValueError("Give a readable Tidigar link, #t=1~...") problems = [] fields, lists = {}, {"a": {}, "s": {}, "p": {}, "m": {}} for record in records[1:]: if record in ("", "!"): continue match = re.fullmatch(r"([a-z])(\d*)(?:=(.*))?", record, re.S) if not match: problems.append(f"{q(record[:30])}: not a record") elif match[1] in lists and match[2]: lists[match[1]][int(match[2])] = match[3] or "" else: fields[match[1] + match[2]] = match[3] or "" def text(value): return urllib.parse.unquote(value.replace("_", " ")) year = int(fields.get("y", "0") or 0) if not 1900 <= year <= 2200: raise ValueError("y: the link needs a year from 1900 to 2200") base = datetime.date(year, 1, 1).toordinal() def day(value, where): try: whole = value if re.fullmatch(r"\d{4}-\d\d-\d\d", value) else f"{year}-{value}" return datetime.date.fromisoformat(whole).toordinal() - base except ValueError: problems.append(f"{where}: {q(value)} is not a date as MM-DD or YYYY-MM-DD") return 0 def count(value, where): if not re.fullmatch(r"\d+d?", value) or int(value.rstrip("d")) < 1: problems.append(f"{where}: days {q(value)} is not a whole number of days, 1 or more") return 1 return int(value.rstrip("d")) ordered = {letter: sorted(entries.items()) for letter, entries in lists.items()} dims = [] for number, value in ordered["m"]: dim, _, options = value.partition(":") dims.append([text(dim), [[text(o), COLORS[i % len(COLORS)]] for i, o in enumerate(options.split(",")) if o]]) keys = {f"a{n}": i for i, (n, _) in enumerate(ordered["a"])} keys.update({f"s{n}": len(ordered["a"]) + i for i, (n, _) in enumerate(ordered["s"])}) keys.update({f"p{n}": len(ordered["a"]) + len(ordered["s"]) + i for i, (n, _) in enumerate(ordered["p"])}) bands = [] for number, value in ordered["p"]: title, start, length, *rest = value.split("/") + ["", ""] first = day(start, f"p{number}") bands.append([text(title), first, count(length, f"p{number}") - 1, PERIOD_COLOR, 1]) vacations = [(p[1], p[1] + p[2]) for p in bands] def end(first, n): if fields.get("w") is None: return n - 1 d, seen = first - 1, 0 while seen < n: d += 1 if datetime.date.fromordinal(base + d).weekday() < 5 and not any(a <= d <= b for a, b in vacations): seen += 1 return d - first def option_numbers(value, where): numbers = [0] * len(dims) for raw in filter(None, value.split(",")): dim, _, option = raw.rpartition(":") hits = [(k, [o for o, _ in opts].index(text(option)) + 1) for k, (d, opts) in enumerate(dims) if (not dim or d == text(dim)) and text(option) in [o for o, _ in opts]] if hits: numbers[hits[0][0]] = hits[0][1] else: problems.append(f"{where}: no dimension has the option {q(text(raw))}") while numbers and not numbers[-1]: numbers.pop() return numbers def after(value, where): refs, shares = [], [] for part in filter(None, value.split(",")): ref, _, share = part.partition(":") if ref not in keys: problems.append(f"{where}: the dependency {ref} names no record") continue refs.append(keys[ref]) shares.append(int(share) if share else 100) while shares and shares[-1] == 100: shares.pop() return refs, shares rows = [] for number, value in ordered["a"]: where = f"a{number}" title, start, length, *rest = value.split("/") + ["", ""] first = day(start, where) row = [text(title), first, end(first, count(length, where)), "", 0, [], [], []] amount = None for part in rest: if part.startswith("d="): row[3] = text(part[2:]) elif part.startswith("cost="): value = part[5:] if not re.fullmatch(r"\d{1,11}", value) or not 0 <= int(value) <= 99_999_999_999: problems.append(f"{where}: cost must be an integer in minor units") else: amount = int(value) elif part.startswith("@"): row[6], row[7] = after(part[1:], where) elif re.fullmatch(r"\d+p", part): row[4] = int(part[:-1]) elif part: row[5] = option_numbers(part, where) if amount is not None: row += ["", amount] rows.append(row) marks = [] for number, value in ordered["s"]: title, date, *rest = value.split("/") + [""] refs = next((after(x[1:], f"s{number}")[0] for x in rest if x.startswith("@")), []) marks.append([text(title), day(date, f"s{number}"), refs, 1 if "fixed" in rest else 0]) if problems: raise ValueError("; ".join(problems)) payload = {"n": text(fields.get("n", "Roadmap")), "y": year} if fields.get("d"): payload["d"] = text(fields["d"]) if "k" in fields: payload["k"] = text(fields["k"]) if "u" in fields: payload["u"] = text(fields["u"]) if "w" in fields: payload["w"] = 1 for key, value in (("m", dims), ("i", rows), ("s", marks), ("p", bands)): if value: payload[key] = value if "v" in fields: mode, *settings = fields["v"].split("/") if mode in LAYOUTS or mode in STYLES: mode, settings = "timeline", [mode] + settings o = {"view": {v: k for k, v in MODES.items()}.get(mode, "timeline")} names = [d for d, _ in dims] for setting in settings: axis, _, value = setting.partition(":") if setting in LAYOUTS: o["timelineActivityRows"] = LAYOUTS[setting] elif setting in STYLES: o["presentationStyle"] = setting elif axis == "color" and value == "@follow-up-status": o["color"] = "follow-up-status" elif (axis == "color" and value == "@progress") or (axis in ("rows", "columns") and value == "progress"): o[AXES[axis]] = "progress" elif axis in AXES and text(value) in names: o[AXES[axis]] = names.index(text(value)) elif axis in ("start", "end"): o["timeline" + axis.title()] = iso(base + day(value, "v")) payload["o"] = o return payload def read(url): """A readable link's roadmap as a plan, to change and build again.""" payload = payload_of(url) base = datetime.date(payload["y"], 1, 1).toordinal() dims, rows, marks = payload.get("m", []), payload.get("i", []), payload.get("s", []) bands = payload.get("p", []) titles = [r[0] if r else "" for r in rows + marks + bands] kind = lambda i: 0 if i < len(rows) else 1 if i < len(rows) + len(marks) else 2 # A predecessor by its title where that finds it again, else by index: other records # may share the title only in a kind looked up later. def ref(index): title = titles[index] clash = any(t == title and kind(i) <= kind(index) for i, t in enumerate(titles) if i != index) return title if title and not clash else index plan = {"version": 1, "name": payload["n"]} if payload.get("d"): plan["description"] = payload["d"] if payload.get("k"): plan["costCurrency"] = payload["k"] if payload.get("u"): plan["costUnit"] = payload["u"] if payload.get("w") == 1: plan["workDays"] = True if dims: plan["dimensions"] = {key: [o if c == COLORS[i % len(COLORS)] else {"name": o, "color": "#" + c} for i, (o, c) in enumerate(options)] for key, options in dims} # Option numbers as dimension name -> option name. chosen = lambda values: {dims[k][0]: dims[k][1][v - 1][0] for k, v in enumerate(values) if v} if rows: plan["activities"] = [] for row in rows: title, start, length, description, progress, values, after = (row + ["", 0, 0, "", 0, [], []][len(row):])[:7] activity = {"title": title, "start": iso(base + start), "end": iso(base + start + length)} if description: activity["description"] = description if progress: activity["progress"] = progress if len(row) > 9: activity["estimatedCostMinor"] = row[9] if chosen(values): activity["values"] = chosen(values) if after: activity["dependsOn"] = [ref(index) for index in after] if len(row) > 7 and row[7]: activity["startAfter"] = row[7] plan["activities"].append(activity) if marks: plan["milestones"] = [dict({"title": m[0], "start": iso(base + m[1])}, **({"values": chosen(m[7])} if len(m) > 7 and chosen(m[7]) else {}), **({"dependsOn": [ref(x) for x in m[2]]} if m[2:3] and m[2] else {}), **({"fixed": True} if len(m) > 3 and m[3] == 1 else {})) for m in marks] if payload.get("p"): plan["periods"] = [dict({"title": p[0], "start": iso(base + p[1]), "end": iso(base + p[1] + p[2])}, **({"values": chosen(p[7])} if len(p) > 7 and chosen(p[7]) else {})) for p in payload["p"]] view, o = {}, payload.get("o", {}) for key, field in VIEW.items(): if field in o: value = o[field] if key == "layout": view.update({"layout": w for w, rows in LAYOUTS.items() if rows == value}) elif key == "style": if value != "standard": view["style"] = value elif value == "progress" or (key == "colorBy" and value == "follow-up-status"): view[key] = "@" + value elif key in ("type", "start", "end"): view[key] = value else: view[key] = dims[value][0] if value != "" else None if view: view.setdefault("type", "grid") plan["view"] = view return plan def summary(payload): """What the link holds, with real dates, to check against the request.""" base = datetime.date(payload["y"], 1, 1).toordinal() rows, marks, dims = payload.get("i", []), payload.get("s", []), payload.get("m", []) place = lambda index: (f"activities[{index}]" if index < len(rows) else f"milestones[{index - len(rows)}]" if index < len(rows) + len(marks) else f"periods[{index - len(rows) - len(marks)}]") def after(refs, shares=()): return (" · after " + ", ".join(place(ref) + (f" ({shares[i]}%)" if i < len(shares) and shares[i] < 100 else "") for i, ref in enumerate(refs))) if refs else "" values = lambda chosen: "".join(f" · {dims[k][0]}: {dims[k][1][v - 1][0]}" for k, v in enumerate(chosen) if v) lines = [f"{payload['n']} ({payload['y']}{', work days' if payload.get('w') else ''})"] for i, row in enumerate(rows): row = row + ["", 0, 0, "", 0, [], []][len(row):] lines.append(f"activities[{i}] {row[0] or '(untitled)'}: {iso(base + row[1])} – {iso(base + row[1] + row[2])}" + (f" · {row[4]}% done" if row[4] else "") + values(row[5]) + after(row[6], row[7] if len(row) > 7 else [])) for i, m in enumerate(marks): lines.append(f"milestones[{i}] {m[0]}: {iso(base + m[1])}" + (" · fixed" if len(m) > 3 and m[3] == 1 else "") + values(m[7] if len(m) > 7 else []) + after(m[2] if len(m) > 2 else [])) for i, p in enumerate(payload.get("p", [])): lines.append(f"periods[{i}] {p[0]}: {iso(base + p[1])} – {iso(base + p[1] + p[2])}" + values(p[7] if len(p) > 7 else [])) return "\n".join(lines) if __name__ == "__main__" and "ipykernel" not in sys.modules: args = sys.argv[1:] if args[:1] == ["--read"]: try: print(json.dumps(read(args[1]), ensure_ascii=False, indent=2)) except ValueError as error: sys.exit(str(error)) else: source = sys.stdin if args[:1] in ([], ["-"]) else open(args[0], encoding="utf-8") plan = json.load(source) try: payload = to_payload(plan) url = link(payload) except ValueError as error: sys.exit(str(error)) print(url + "\n\n" + summary(payload) + f"\n\nFragment: {size(url) - len(OPENER) - 1} of 1900 characters.")